Between the two crashes, there was a window in which the second one could have been prevented, and the documentary record of that window is damning. After Lion Air, the Federal Aviation Administration chose the mildest tool in its kit: an emergency airworthiness directive telling crews how to counter runaway stabilizer trim, paired with a Boeing operations bulletin. The aeroplane kept flying. Inside the agency, however, the risk machinery produced a very different answer. In December 2018, FAA analysts ran the Lion Air scenario through the agency's Transport Aircraft Risk Assessment Methodology and estimated that, without a fix to MCAS, the 737 MAX fleet could suffer fifteen additional fatal crashes over its lifetime, with more than 2,900 deaths. Despite that assessment, the FAA permitted the MAX to continue flying while Boeing designed, and the agency validated, a software fix, justifying the decision in the months that followed by saying it lacked appropriate data to act. Ethiopian Airlines flight 302 crashed three months after the analysis was run. Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15)

After Addis Ababa, continued flight became untenable everywhere except, briefly, in Washington. China's regulators moved first, ordering the MAX down within a day, and the cascade followed: the United Kingdom, India, Australia and others closed their skies. The FAA held out. Its public position, as late as the morning of 13 March 2019, was that its review had found no systemic performance issues and no basis for grounding. Canada broke ranks that day, its transport minister Marc Garneau citing new satellite data showing possible similarities between the two flights. Hours later, President Donald Trump announced the decision himself: the FAA would issue an emergency order, he said, based on new information and physical evidence from the crash site and elsewhere. The agency's order followed, three days after the world had started moving. Boeing grounds entire 737 Max crash aircraft fleet - BBC (2019-03-13) Statement on the temporary grounding of Boeing 737 MAX aircraft - US Department of Transportation (2019-03-13)

Warnings had been sounding on the factory floor for more than a year before the first crash. In June 2018, Ed Pierson, a senior supervisor at the Renton plant where the MAX was built, emailed the 737 programme's general manager, Scott Campbell, asking for a meeting about safety concerns: production and schedule pressure, he wrote, was degrading quality control. "As a retired Naval Officer and former Squadron Commanding Officer, I know how dangerous even the smallest of defects can be to the safety of an airplane," Pierson wrote. "Frankly right now all my internal warning bells are going off. And for the first time in my life, I'm sorry to say that I'm hesitant about putting my family on a Boeing airplane." When the meeting finally happened, five weeks later, Pierson said that in the military they would halt production over the kinds of problems he was seeing. Campbell's alleged reply entered the congressional record verbatim: "The military is not a profit making organization." Boeing kept ramping up the line, even rehiring retired workers to keep it moving. Lion Air flight 610 crashed three months later. Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15)

What was supposed to last weeks became twenty months. Boeing, which had continued building MAX jets it could not deliver, announced in December 2019 that it would suspend production on the 737 line the following month, a step without precedent for its most important product. The suspension was, above all, a business decision about undelivered inventory, not a response to the safety concerns raised on the factory floor a year and a half earlier. Parked aeroplanes accumulated in storage lots and employee car parks across Washington state. More corrosive than the money was the calendar: every slipped return date announced with confidence, and every new problem discovered in the interval, from wiring bundles to software quirks to debris found inside fuel tanks of undelivered jets, deepened the impression of a company that had lost control of its own product. Senators rip Boeing chief over Max jet crashes - The Guardian (2019-10-29) Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15)

By late 2019, the scale of the grounding was industrial. About 700 MAX aircraft were grounded or built and awaiting delivery while airlines ripped the type out of their schedules month after month. The grounding had cost the airlines some 4 billion dollars by that autumn; Southwest, the largest MAX customer, had cancelled thousands of flights, and its pilots' union sued Boeing over lost pay. Boeing's own estimate of its losses reached 9 billion dollars with the meter still running. Its stock had fallen fifteen percent since the Ethiopian crash, erasing 34 billion dollars in value and prompting a shareholder lawsuit. Europe's regulator, meanwhile, had made plain that it had so little faith in Boeing and its American overseer that it might take the unprecedented step of withholding approval even after the FAA signed off. Inside the company the reckoning had begun to turn inward: in September, an internal committee recommended that the top engineers report to the commercial airplane division's chief engineer, a tacit admission that the corporate evolution of the previous two decades had played a role in the disaster. None of it put the aeroplane back in the air. "I Will Never Let Boeing Forget Her" - ProPublica (2019-11-11)

Accountability at the top arrived in stages. Dennis Muilenburg, who had spent 2019 promising a safe and imminent return, was stripped of the chairman's title in October and resigned as chief executive on 23 December 2019, effective immediately. The board's own statement conceded the point his critics had made all year: a change in leadership was necessary to restore confidence and repair relationships with regulators, customers and other stakeholders. David Calhoun, the board's chairman, moved into the chief executive's office in January 2020 with a mandate, in the company's words, of renewed commitment to full transparency with the FAA. Boeing announces leadership changes - Boeing (2019-12-23)

An accounting of a more personal kind had come at the end of October 2019, when Muilenburg testified before two congressional committees across two days of challenge. "If we knew then what we know now, we would have grounded right after the first accident," he told the House panel, while demurring repeatedly when asked whether the disasters showed that the FAA's delegation of safety work to Boeing needed reining in. The Stumo family sat behind him at both hearings. At the first, he opened with an apology addressed to the committee rather than to the families seated at his back; as he left the room, Nadia Milleron called out to him. He stopped and looked at her. "I'm sorry," he said. "I Will Never Let Boeing Forget Her" - ProPublica (2019-11-11)

The fix itself, when it came, embodied the lessons the design had refused. MCAS would compare readings from both angle of attack sensors instead of trusting one. It would activate only once per event rather than repeatedly. It would never command more stabilizer movement than the pilots could counter with the control column. The disagree alert that had been dead on most of the fleet would work as standard. And in a reversal that would have been unthinkable in 2016, pilots would train in a simulator before flying the jet with passengers. Boeing Max cleared for takeoff, 2 years after deadly crashes - Associated Press (2020-11-18)

On 18 November 2020, twenty months after the world grounded the jet, the Federal Aviation Administration rescinded its prohibition order, and kept hold of the leash: rather than delegating as before, the agency said it would inspect and issue an airworthiness certificate for every newly built MAX itself, aircraft by aircraft. The agency's administrator, Steve Dickson, a former airline pilot, had flown the modified aircraft himself on 30 September, two landings and a series of air work maneuvers over about a two hour period, and had come down telling reporters, "I liked what I saw." He felt prepared, he said; most importantly, he felt the training had prepared him to be very comfortable. Announcing the rescission seven weeks later, he said he was one hundred percent comfortable with his family flying on it. "Not a day goes by that I and my colleagues don't think about the Lion Air and Ethiopian Airlines victims and their families," he said in the announcement. American regulators had insisted from the start that they would move on the data and not on the crowd, and in the return as in the grounding they moved on their own timetable, this time ahead of most of the world. Boeing Max cleared for takeoff, 2 years after deadly crashes - Associated Press (2020-11-18) Rescission of the emergency order of prohibition - Federal Register (2020-11-20) FAA Clears Boeing 737 Max To Fly Again - NPR (2020-11-18) 'I Like What I See': FAA Chief Flies 737 Max, But Not Ready To Recertify Plane - NPR (2020-09-30)

Other authorities conducted their own reviews rather than rubber stamping the FAA's. Europe's regulator, EASA, ran an independent assessment and declared a modified MAX safe to return on 27 January 2021, mandating its own package of software upgrades, electrical wiring rework and maintenance checks. "We have reached a significant milestone on a long road," said Patrick Ky, the agency's executive director, stressing that the assessment had been carried out in full independence from Boeing and the FAA. China, the first country to ground the jet, was the last major market to clear it, in December 2021, nearly three years after the grounding. EASA declares Boeing 737 MAX safe to return to service in Europe - EASA (2021-01-27) China clears Boeing 737 Max to fly again - Associated Press (2021-12-02)

Returning to service settled the engineering question and nothing else. The families who had asked for full recertification, for simulator training, and for candour about how the aeroplane had been approved had won only the middle demand. Above the ungrounding hung the unfinished business of blame: the Justice Department's criminal case was still open, the internal messages were still surfacing in tranches, and the FAA's own culture survey was describing an agency drifting from its safety mission. The MAX was back in the sky. What it had carried down with it, trust in the company that built it and the regulator that approved it, would take far longer to repair, and in some quarters it never returned. Boeing crash: I miss them every minute - BBC (2019-07-17)