Neo versus MAX
1 November 2026
No drawing board gave birth to the 737 MAX. It was born, by the account Congress later assembled, in a phone call between two chief executives in the spring of 2011. To understand the call, start with the rival. In December 2010, Airbus had launched the A320neo family, the initials standing for new engine option: the same airframe with new fuel efficient engines promising up to fifteen percent better fuel economy, which translated into serious cost savings for airlines. Boeing's first instinct was to dismiss it. Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15)
At a Boeing Commercial Airplanes employee meeting on 14 January 2011, the division's chief executive, James Albaugh, told his workforce that Airbus would find reengining harder than it expected, and that Boeing would not follow. Airbus, he predicted, would "find reengining the A320 more challenging than they think it will be". "I don't think we will reengine the 737," he said. "It's really hard to come up with a compelling business case to do that." The right answer, he argued, was "to probably do a new small airplane that might come out toward the end of this decade". His customers agreed with him, he added: "Every customer I talk to has a real hard time understanding why a reengined airplane makes sense." Inside the company, the thinking had run the same way for years: since 2005, Boeing had toyed with a clean sheet replacement for the 737 under an internal effort it called Project Yellowstone. Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15) Boeing launches 737 new engine family with commitments for 496 airplanes from five airlines - Boeing (2011-08-30)
Then the phone rang. According to the New York Times account later cited by the House committee, Gerard Arpey, the chief executive of American Airlines, called Jim McNerney, the chief executive of Boeing, with a serious message delivered frankly: American was about to close a deal for hundreds of A320 family aircraft from Airbus, and if Boeing wanted to keep the airline's business it needed to offer a comparable aircraft soon. The call reportedly rattled Boeing's executives. For more than a decade, American had bought exclusively from Boeing. Losing it to Airbus was not a bad quarter; it was a strategic wound. Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15)
On 20 July 2011, Airbus announced that American had ordered 260 A320 family aircraft, including 130 of the new neo variant. Boeing, having reversed itself, salvaged half the deal: American pledged to take 100 737 to 800s and 100 of a reengined 737 that did not yet formally exist, saying it was "pleased to be the first airline to commit to Boeing's new 737 family offering". Six weeks later, on 30 August 2011, Boeing made it official and gave the aeroplane its name: the 737 MAX, in three variants, the MAX 7, MAX 8 and MAX 9. The launch came with commitments from five customers for 496 aircraft, and a market Boeing sized at more than 23,000 single aisle jets worth nearly two trillion dollars over twenty years. The 737 it was extending was already, in the company's own words, the world's most popular and reliable commercial jet transport, with more than 9,000 orders to date. Albaugh, seven months after telling employees he could not make the case for the aeroplane, was quoted saying that the reengined 737 would let Boeing "continue to deliver the most fuel efficient, most capable airplane with the lowest operating costs in the single aisle market". Boeing introduces 737 MAX with launch of new aircraft family - Boeing (2011-08-30) Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15) Boeing launches 737 new engine family with commitments for 496 airplanes from five airlines - Boeing (2011-08-30)
Where the 787 had been proof that Boeing could still design a clean sheet aeroplane, the MAX was the admission that it would not. Boeing placed this bet with fresh scars of its own. In the spring of 2004 the company had started designing the 787 Dreamliner, a 330 passenger jet; the following year it named a new chief executive, Jim McNerney, a Harvard MBA who had worked at Procter & Gamble, McKinsey and General Electric. By the time the 787 was ready, in 2011, the programme was three years late and tens of billions of dollars over budget, and a year later, after its batteries displayed a tendency to catch fire, the fleet was grounded. Richard Aboulafia, an analyst with the Teal Group, the aviation market analysis firm, had misgivings even then: in his January 2013 newsletter, after an earnings call, he fretted about Boeing's unwillingness to learn from the Dreamliner's troubles. "I Will Never Let Boeing Forget Her" - ProPublica (2019-11-11)
On paper, the economics of the choice were simple and, on their own terms, rational. Building a brand new aeroplane in 2011 was estimated to cost around ten billion dollars; reengining the existing 737 NG to produce the MAX would cost about three billion, according to Aboulafia. The derivative path was also faster, and speed was the point: Airbus was taking neo orders by the hundred while a clean sheet Boeing would have been a decade away. In December 2011, Southwest Airlines, the biggest 737 operator in the world, signed on as the MAX's launch customer, eventually holding hundreds of firm orders with options for nearly as many more. Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15)
Economics were the pitch. Airlines would gain a 7 percent advantage in operating costs over future competing airplanes, the launch materials said, through optimized CFM International LEAP 1B engines, refinements to the structure and a new Sky Interior whose bins disappeared into the ceiling, while inheriting a reliability record of 99.7 percent on time departures from the Next Generation line. "The 737 MAX offers airlines the right solution and the best choice for creating the most successful future with improved profitability," said Nicole Piasecki, the commercial division's vice president of business development and strategic integration. Even the name was the strategy: not a new airplane, a maximum one. Boeing Introduces 737 MAX With Launch of New Aircraft Family - Boeing (2011-08-30)
What the balance sheet did not record was what the choice asked of the aeroplane. The MAX was the twelfth derivative of a design first certified in December 1967, an airframe conceived when jet engines were slim tubes and airports had stairs instead of jet bridges. Its new CFM LEAP 1B engines were considerably larger than anything the 737's low slung wing had ever carried. To keep them off the tarmac, Boeing mounted them further forward and higher on the wing, extended the nose gear by about eight inches, stretched the tail cone by 43 inches and added more than 6,500 pounds of weight. Those changes altered the aircraft's aerodynamics. In particular, at high angles of attack, applying engine thrust now tended to push the nose up further, nudging the jet toward the aerodynamic stall every pilot is trained to avoid. The 737 had been here before, in a sense: across six decades it had passed through the original, Classic and Next Generation families, each new category carrying a new engine, more range, better fuel economy and less noise. But no previous stretch had asked so much of the old frame. Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15)
By the time the MAX was announced, the 737 line had been running for more than four decades. Boeing had been building it, in derivative after derivative, since the first came off the assembly line in 1967. A brand new aircraft, the committee conceded, would have been technically exciting and challenging, but the cost and time involved made Boeing's executives anxious that they would lose out in competition to Airbus. So the programme was shaped from its first days by an aggressive production schedule and cost conscious measures aimed at that competition, which played, in the report's judgment, a paramount role in everything that followed. An aeroplane certified in the Johnson administration would be asked, one more time, to become a new machine. Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15)
Certification, as much as aerodynamics, carried the old design forward. On 30 June 2012, Boeing submitted its G 1 Issue Paper to the FAA office overseeing the company, laying out the differences between the 737 to 800 NG and the proposed 737 to 8 MAX and thereby setting the certification basis for the new jet. The paper listed 201 distinct significant changes: 56 to the airframe, 94 to systems, including 15 avionics and 13 flight control changes, 36 to propulsion and 15 to payload. MCAS appeared in it briefly, cited as one of the software changes to the flight control system. Because the MAX was certificated as a change to an existing type rather than as a new aircraft, the process ran under what regulators call the Changed Product Rule, which determines when older, earlier amendments of the airworthiness standards, rather than the newest, may be applied to a derivative design. The 737's age, the very thing that made it familiar to airlines, also meant whole areas of the aeroplane would be certified against the standards of another era. Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15)
There was a second inheritance, less visible than the engines. The House committee heard from multiple current and former Boeing employees who traced the company's trajectory to its 1997 merger with McDonnell Douglas: people who had joined what they called an engineer's paradise, where safety sat at the forefront of business decisions, and who watched production schedules and monetary costs come to drive commercial aircraft programmes instead. Their testimony sits awkwardly beside the financial record. Between 2013 and 2019, the very years of the MAX's design, development and certification, Boeing spent 17.4 billion dollars on dividends and another 43.1 billion dollars buying back its own shares, a distribution analyzed by the economist William Lazonick, who argued it may have crowded out spending on adequate testing and safety analysis. In his last three years as chief executive, McNerney himself received 80 million dollars. Stan Sorscher, a Boeing physicist and union bargaining member, dated the turn to a labor management breakfast shortly before the merger, at which a top executive dismissed the money his engineers' process improvements were saving with a lesson in the new arithmetic. "The decisions I make have more influence over outcomes than all the decisions you make," Sorscher recalled the executive saying. "It was: 'I can't help but make a billion dollars every time I pick up the phone. You people do things that save $400,000, that take one shift out of flow time, who gives a crap?'" Three years later, the engineers' union went on strike over bonus pay and cuts in health coverage, and James Dagnon, another Boeing executive, told the engineers they had to accept they were no longer the center of the universe. "We laughed," Sorscher recalled. "This is an engineering company, these are complex, heavily engineered products. Of course we're the center of the universe. But he wasn't kidding. We didn't get it. Who is the center of the universe? It's the executives." Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15) "I Will Never Let Boeing Forget Her" - ProPublica (2019-11-11)
None of this made the MAX inevitable, and little of it was secret. Boeing faced a genuine competitive emergency, answered it the way publicly traded manufacturers are built to answer it, and sold the answer brilliantly: the MAX would become the fastest selling aeroplane in the company's history. But the constraints were set in those months of 2011. The new aircraft had to arrive fast, cost little, and, above all, fly like the old one, because airlines buy fleets, not aeroplanes, and a fleet only works if a pilot qualified on the old model can step into the new one without expensive retraining. The committee would later compress the consequences into a single finding: there was tremendous financial pressure on Boeing and the 737 MAX programme to compete with the A320neo, pressure that produced extensive efforts to cut costs, hold the schedule and avoid anything that might slow the jet's path to market. Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15)
The MAX first flew in January 2016, won its amended type certificate from the Federal Aviation Administration on 8 March 2017, and entered passenger service with Malindo Air, Lion Air's Malaysian sister company, in May 2017. Seventeen months later, one of those jets was at the bottom of the Java Sea. Final 737 MAX report - US House Committee on Transportation and Infrastructure (2020-09-15)