At 5:45 in the morning on Tuesday, April 20, 2010, a Halliburton cementing engineer named Nathaniel Chaisson sent an email from the drilling rig Deepwater Horizon, fifty miles off the Louisiana coast, to a colleague in Houston. He had good news from the bottom of the Macondo well: "We have completed the job and it went well." The job he meant had been finished at 12:40 that morning, and the last check had come out clean: with the pumps off, a BP representative and Halliburton's Vincent Tabler had opened a valve at the cementing unit to see whether fluid flowed back from the well. Models predicted five barrels; the men watched five and a half barrels come back, tapering to a trickle, and concluded the float valves at the bottom were holding. Outside it was still dark. Beyond the glare of the floodlights, the Gulf of Mexico lay calm, and the rig's four decks towered above the water on four huge white columns floating on massive pontoons. Its derrick rose more than twenty stories over the top deck. On the bridge, two officers watched over the satellite guided dynamic positioning system that drove thrusters powerful enough to hold the 33,000 ton rig centered over a well in high seas. The Macondo job was nearly finished, and everyone on board believed the hard part was behind them. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Deepwater Horizon was the pride of the Transocean fleet, a semisubmersible built for $350 million and leased to BP for as much as $1 million a day. Since its maiden voyage to the Gulf in 2001 it had worked under contract to BP, and by 2010 it was celebrated inside both companies. On board that Tuesday were about 126 people: roughly eighty Transocean employees, a few BP men, cafeteria and laundry workers, and a rotating cast of specialists, Halliburton cementers, Sperry Sun mud loggers, M-I SWACO mud engineers, Oceaneering robot operators, tank cleaners. Helicopters came and went from the top deck helipad with workers and supplies. Most of the crew worked twelve hour shifts, three weeks on and three weeks off, and the pay was good money for dangerous work. The rig never slept. Among the specialists aboard that week was Brian Morel, the BP drilling engineer who had helped design the Macondo well, flown out to observe the final stages of the job he had been managing from his inbox in Houston. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01) Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Beneath them lay Mississippi Canyon Block 252, a tract of Gulf seabed that BP had leased from the federal government two years earlier. The rig floated in 4,992 feet of water, and the well bore ran another two and a half miles below the seabed into a Middle Miocene reservoir where oil and gas lay trapped in porous rock at temperatures above 200 degrees. Macondo was BP's first well on the new lease, drilled both to find oil and to learn the geology of the block, and the drilling had been complicated from the start. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Macondo's owners had budgeted a fixed pot of money and seven weeks to drill the well, and by April 20 both were long spent. The job was weeks behind and millions over, and the men aboard knew the rig cost its operator a fortune by the day. That arithmetic hung over every decision out there. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

The work they did belonged to one of the world's great industrial frontiers. The Gulf's offshore workforce numbered 35,000 people on 90 big drilling rigs and 3,500 production platforms, and since 2001 it had suffered 1,550 injuries, 60 deaths, and 948 fires and explosions. Deepwater Horizon, for all that, had gone years with remarkably few injuries. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01) Deepwater Horizon's Final Hours - The New York Times (2010-12-26)

On this particular morning, BP's senior man aboard was a newcomer. Robert Kaluza was on the rig for the first time, four days into a relief stint for Ronald Sepulvado, the regular well site leader, who had flown ashore on April 16 for a required well control class. It was a job that paid well into six figures. Kaluza's day shift would end at six that evening, when Don Vidrine took over for the night. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01) Deepwater Horizon's Final Hours - The New York Times (2010-12-26)

Still, that Tuesday morning belonged to the good news. On the 7:30 operations conference call to BP in Houston, Morel reported that the final cement job at the bottom of the well had gone fine. A three man Schlumberger team was standing by on the rig, flown out to run a suite of tests on the new cement seal, including a cement bond log. But the BP team's plan allowed them to skip the evaluation if the cementing had gone smoothly, and it had gone smoothly. The decision was made to send the Schlumberger men home on the 11:00 a.m. helicopter, saving time and the $128,000 fee. As BP wells team leader John Guide put it, "Everyone involved with the job on the rig site was completely satisfied with the [cementing] job." Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

At 8:52 a.m., Morel emailed the Houston office before flying out: "Just wanted to let everyone know the cement job went well. Pressures stayed low, but we had full returns on the entire job... We should be coming out of the hole [well] shortly." At 10:14, David Sims, BP's new drilling operations manager in charge of Macondo, wrote back: "Great job guys!" While the emails flew, the drill crew ran a positive pressure test on the casing, pumping up the pressure inside the steel to prove it was intact. It held. "When you run the last string of casing, and you've got it cemented, it's landed out, and a test was done on it, you say, 'This job, we're at the end of it, we're going to be okay,'" subsea engineer Ross Skidmore explained later. The mood on the rig was upbeat. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Around noon a helicopter settled onto the helipad and four Houston executives stepped out for a twenty four hour "management visibility tour." Two were Transocean men, Buddy Trahan, a vice president and operations manager for assets, and Daun Winslow, who had worked his way up from assistant driller to operations manager. Two were BP men, Sims and Pat O'Bryan, the vice president for drilling and completions in the deepwater Gulf. Jimmy Harrell, Transocean's offshore installation manager, and Captain Curt Kuchta, who had flown in that morning to start his three week hitch, greeted them at the pad. At four in the afternoon Harrell began walking the visitors through the rig, joined by Chief Engineer Steve Bertone and senior toolpusher Randy Ezell, a twenty three year Transocean veteran who ran the drilling floor. If anyone knew this rig, it was those three. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

The evening's main task was the negative pressure test, the last major check before the crew sealed the well for temporary abandonment and made way for a smaller production rig. At 5:00 p.m. the crew began. They bled the drill pipe down, and the pressure built back. They bled it again, and again it came back. As the test wore on, the drill shack grew crowded: the night crew was arriving to relieve the day shift, and Harrell brought the VIPs through as part of the tour. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Winslow threaded his way through the shack and tapped Dewey Revette, the driller on duty, on the shoulder. "I said, 'Hey, how's it going, Dewey? You got everything under control here?' And he said, 'Yes, sir.' And there seemed to be a discussion going on about some pressure or a negative test. And I said to Jimmy [Harrell] and Randy Ezell, 'Looks like they're having a discussion here. Maybe you could give them some assistance.' And they happily agreed to that." Winslow moved on with the tour. The discussion in the shack went on without him. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

At about six, Jason Anderson, a toolpusher from Bay City, Texas, turned to Ezell and said, "Why don't you go eat?" Ezell had a meeting with the visitors at seven. "I can go eat and come back," he answered. Anderson had been on the rig since it was built, he was respected as one of the finest well control men in the fleet, and this was his last shift: he had been promoted to teach at Transocean's well control school and was due to fly out the next day. "Man, you ain't got to do that," he told Ezell. "I've got this. Don't worry about it. If I have any problems at all with this test I'll give you a call." Ezell went. "He was just like a brother," he said later. "So I had no doubt that if he had any indication of any problem or difficulty at all he would have called me." Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Inside the shack, the men argued over readings that would not settle. Vidrine wanted the test run again a different way, and the men ran it again, and this time it passed. At 8:00 p.m. they declared the well's integrity confirmed and moved on. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

At seven, the VIPs had gathered with the rig's leaders in the third floor conference room. O'Bryan, four months into his job and on board partly to learn what made the rig a standout, told the room what the company thought of it: the Deepwater Horizon was "the best performing rig that we had in our fleet and in the Gulf of Mexico. And I believe it was one of the top performing rigs in all the BP floater fleets from the standpoint of safety and drilling performance." In seven years of drilling, the rig had not recorded a single lost time injury. The managers also talked through a maintenance backlog that a September 2009 BP safety audit had put at 390 items requiring 3,545 man hours of work. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Around nine, Winslow suggested they all see the bridge, which had not been on the tour. Kuchta welcomed them in. The two dynamic positioning officers on watch, Yancy Keplinger and Andrea Fleytas, showed the visitors the radars and current meters and offered them a turn on the rig's dynamic positioning simulator. They programmed in 70 knot winds and 30 foot seas, knocked out two of the rig's six thrusters, and let Sims work the hand controls. It was a pleasant end to a ceremonial day. When the four men walked back outside, the Gulf air was warm, the water calm as glass, and beyond the glare of the rig's lights the night sky glimmered with stars. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Moored alongside all evening was the Damon B. Bankston, a 262 foot supply vessel, taking aboard the drilling mud the rig was pumping out of the well and the riser, thousands of barrels of it, ferried across a catwalk of hoses in the dark. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01) Deepwater Horizon's Final Hours - The New York Times (2010-12-26)

Down on the drill floor, the well was being readied for its sleep. With the negative test declared good, the crew reopened the blowout preventer and pumped seawater down the drill pipe, pushing the heavy drilling mud and a column of spacer fluid up and out of the riser, the great pipe that connected the rig to the wellhead a mile below. When the spacer reached the surface it had to be tested for oily sheen before it could be dumped overboard, and at 9:15 the crew began discharging it into the Gulf. The rig settled into its ordinary night rhythm, generators humming, floodlights burning, the sea black and flat around it. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Two and a half miles beneath the seabed, in rock older than the Gulf itself, the Macondo reservoir sat at more than 200 degrees, under thousands of pounds of pressure, held back now by a single column of cement that had never been logged, a set of valves that had been forced once already, and a test that had told the truth to men who talked themselves out of hearing it. The crew on the drill floor believed they were finishing a difficult well. They were half an hour from the end of the Deepwater Horizon. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01) Deepwater Horizon's Final Hours - The New York Times (2010-12-26)