Sitting on the seafloor beneath the Deepwater Horizon was the machine that was supposed to make everything else forgivable. The blowout preventer was a five story stack of valves and rams bolted to the wellhead, and its last line of defense was the blind shear ram, a pair of blades designed to slice through the drill pipe and seal the open well when all else had failed. Everything else could go wrong, the saying went, just so long as "the pinchers" went right. On April 20, everything else went wrong, and the pinchers did not go right. Regulators Failed to Address Risks in Oil Rig Fail-Safe Device - The New York Times (2010-06-21) Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)
One blind shear ram was all the Deepwater Horizon's blowout preventer had. The industry had already begun moving to blowout preventers with two blind shear rams, one as backup for the other; but by 2010, industry and government records showed, roughly two thirds of the rigs in the Gulf still had only one. Neither Transocean nor BP took steps to outfit the Deepwater Horizon with a second ram. By the summer of 2010, according to BP, every rig under contract to the company carried two. Regulators Failed to Address Risks in Oil Rig Fail-Safe Device - The New York Times (2010-06-21)
Its record was sobering even then. In 1990, a blind shear ram could not snuff out a major blowout on a rig off Texas: it cut the pipe, but the sealing mechanism was damaged. In 1997, a blind shear ram failed to cut through a thick tool joint connecting two sections of drill pipe during a blowout off Louisiana. The physics were unforgiving: the ram had to sever hardened steel pipe, in the dark, a mile underwater, on the first try, and it had to hit the pipe where the pipe was cuttable. Regulators Failed to Address Risks in Oil Rig Fail-Safe Device - The New York Times (2010-06-21)
This particular machine's weaknesses had been catalogued a decade before it failed. In 2000, engineering consultants hired by Cameron, the blowout preventer's manufacturer, assessed the reliability of the very stack that sat under the Deepwater Horizon. They zeroed in on the blind shear ram and warned of a "single point failure": one of the small T shaped shuttle valves controlling the hydraulic fluid that drives the ram's blades had no backup, and if it jammed or leaked, the blades would not budge. That one valve, the consultants calculated, represented 56 percent of the entire preventer's "failure likelihood." BP said the report was used to keep critical components and maintenance clearly understood, and that a portion of the assessment it declined to release found the overall risk of failure tiny. The regulators, for their part, had little likelihood of ever knowing the assessment existed. Regulators Failed to Address Risks in Oil Rig Fail-Safe Device - The New York Times (2010-06-21) Regulators Failed to Address Risks in Oil Rig Fail-Safe Device - The New York Times (2010-06-21)
Field experience was just as bleak as the engineering. One study found 11 cases in which crews on deepwater rigs lost control of their wells and relied on their blowout preventers to stop a spill; in only six were the wells brought under control, a "failure" rate of 45 percent. MMS did act once on the warnings it received, after a fashion: in 2003 it adopted a regulation requiring companies to submit test data proving their blind shear rams could cut the specific drill pipe in use under the pressures they would face. But the agency never checked whether the industry as a whole was complying, and the rule said nothing about redundancy. Regulators Failed to Address Risks in Oil Rig Fail-Safe Device - The New York Times (2010-06-21)
There had been warnings aboard the rig itself. Weeks before the blowout, after a well control event, chief electronics technician Mike Williams watched a supervisor handle something that had come up in the drilling fluid. "He discovered chunks of rubber in the drilling fluid. He thought it was important enough to gather this double handful of chunks of rubber and bring them into the driller shack. I recall asking the supervisor if this was out of the ordinary. And he says, 'Oh, it's no big deal.' And I thought, 'How can it be not a big deal?'" The rubber was from the annular preventer, the big sealing element at the top of the blowout preventer, and pieces of it should not have been coming up the well. Blowout: The Deepwater Horizon Disaster - CBS News 60 Minutes (2010-08-19)
Maintenance had not kept pace with the machine's importance. The Deepwater Horizon's blowout preventer was a decade old, and Transocean had never performed the expensive 90 day maintenance inspection that its manufacturer said should be done every three to five years, a schedule industry standards and federal regulations echoed. BP and a Transocean safety consultant had both pointed out that the rig's preventer was past due. After the disaster, examination turned up a host of problems aboard the stack and its control systems: dead batteries, bad solenoid valves, leaking hydraulic lines, overlooked or ignored. Deepwater Horizon's Final Hours - The New York Times (2010-12-26)
On the night of April 20, the crew used the preventer exactly as designed, and it failed in sequence. Witness accounts indicate the rig crew activated an annular preventer around 9:41 p.m. and a variable bore ram around 9:46; by then the flow rates were likely too high for either to seal. When the emergency disconnect was finally punched on the bridge after the first explosion, the panel indicators lit up and nothing happened: the blast may already have severed the multiplex cables carrying the command to the seafloor. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01) Deepwater Horizon's Final Hours - The New York Times (2010-12-26)
Even then, one more automatic safeguard remained. The blowout preventer's deadman system was designed to fire the blind shear ram on its own if power, communications and hydraulics between rig and seafloor were ever cut together, as they were when the rig burned and fell away. When the preventer's two control pods were later recovered and tested, the results showed the emergency system had been crippled before the well ever blew. Miswiring in the blue pod had drained a critical battery, rendering the pod inoperable on the day of the accident. In the yellow pod, a miswired solenoid valve had its two redundant coils wired to oppose one another: had both energized together, the valve would have stayed shut and the ram would never have moved. Macondo Report Volume 2: Explosion and Fire at the Macondo Well - U.S. Chemical Safety Board (2014-06-05)
The deepest failure, though, was mechanical, and it took the Chemical Safety Board four years to name it. Other inquiries had concluded the blind shear ram did not close until days later, on April 22, when robots triggered it at the seafloor. The board's own testing pointed to that night instead: in its reading of the full BOP data, the ram most likely closed in the first moments after the explosions, fired by the deadman through the yellow pod, where a second drained battery had knocked out one of the two miswired coils and let the other work alone, two failures fortuitously canceling each other out. What kept the ram from sealing the well was the pipe itself. Pressure data indicates the crew most likely closed the middle pipe rams at about 9:47 that night, and that well control action established the large pressure difference between the inside and outside of the drill pipe that buckled it where it crossed inside the preventer, a phenomenon the board called "effective compression," and pushed it off center, out of the blades' reach. The ram closed on buckled pipe and could not seal it, and the well kept flowing around the ruin. The board's central finding was that the pipe "buckled for reasons the offshore drilling industry remains largely unaware of," and it warned that the same phenomenon could compromise blowout preventers still working around the world. CSB final report finding on blowout preventer pipe buckling - U.S. Chemical Safety Board (2014-06-05) Macondo Report Volume 2: Explosion and Fire at the Macondo Well - U.S. Chemical Safety Board (2014-06-05)
Its authors were explicit that this was not a closed file. The buckling, the board warned, could occur even when a well was shut in and apparently in a safe and stable condition, and it was unlikely to be detected by the drilling crew until it had rendered the blowout preventer inoperable. It called for better management of safety critical equipment across the industry and its regulators. The machine the industry had sold for decades as the ultimate fail safe had failed in a way almost nobody understood, and the machines still working the oceans were built the same way. CSB final report finding on blowout preventer pipe buckling - U.S. Chemical Safety Board (2014-06-05) Macondo Report Volume 1 - U.S. Chemical Safety Board (2014-06-05) Deepwater Horizon's Final Hours - The New York Times (2010-12-26)
Each barrier at Macondo was supposed to be backed by the one behind it. The mud backed the cement; the preventer backed the mud; the blind shear ram backed the preventer; the deadman backed the men who pushed the buttons. On April 20 the failures ran straight through the stack, and what was left was an open well, a mile down, flowing into the sea. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01) Regulators Failed to Address Risks in Oil Rig Fail-Safe Device - The New York Times (2010-06-21) CSB final report finding on blowout preventer pipe buckling - U.S. Chemical Safety Board (2014-06-05)