The agency that was supposed to stand between companies like BP and the Gulf of Mexico was born with a conflict built into it. The Minerals Management Service was created in 1982 to collect the money: royalties, rents and bonuses from oil and gas drilled on federal lands and waters. With the run up in oil prices, those revenues had become the second largest source of income for the United States Treasury. In 2008 alone, MMS took in $23 billion. The agency's founding, two decades earlier, had been driven by exactly that priority: a single September 1980 lease sale in New Orleans brought in a record $2.8 billion in cash bonuses, and the government wanted an office whose first loyalty was to the revenue stream. Regulating the safety of the drilling that produced all that money was, at best, the agency's second job. The split personality was older than the agency. It dated to the 1970s, when the oil embargo made domestic energy production a national project at the very moment environmental protection became one too, and Washington lodged both ambitions in the same Interior Department, where they have wrestled ever since. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01) Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

That preoccupation did not merely divert leaders' attention from safety; it corroded the agency's ethics in places. The most notorious case came out of Denver, where MMS ran a royalty in kind program that accepted oil and gas instead of cash. In September 2008, the Interior Department's inspector general reported that more than a dozen employees in that office had engaged in unethical and criminal conduct, socializing with and receiving a wide array of gifts from the companies they did business with. The inspector general allowed that 99.9 percent of Interior employees were hard working and ethical, but added that "the conduct of a few has cast a shadow on an entire bureau." Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Nor was the rot limited to the money side. In 2010, an inspector general's report found that before 2007 "a culture of accepting gifts from oil and gas companies was prevalent throughout the MMS Lake Charles[, Louisiana] office," the district office that helped oversee drilling in the Gulf. Employees admitted to attending sporting events sponsored by oil and gas companies, taking lunches and accepting gifts; one inspector had conducted inspections on a company's platforms while negotiating for, and later accepting, a job with that company. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Ken Salazar arrived at the Interior Department in January 2009 promising to clean it up. Only days after taking office he met with MMS employees and announced an ethics reform initiative. But ethics reform did not touch the deeper problem, which was structural: the same agency promoted leasing, collected the revenue and was supposed to police the safety of the operations, and it was starved of people who understood the technology. MMS personnel responsible for deciding whether drilling permits were granted lacked the expertise to judge the safety of what they were approving. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Attempts to manage risk by asking nicely went nowhere for two decades. MMS's voluntary safety program, begun in the early 1990s, was met with open skepticism by regulators who had done it the other way: at a 1996 industry forum in Houston, a UK Health and Safety Executive official gave a presentation titled "US Voluntary SEMP Initiative: Holy Grail or Poisoned Chalice?" and called the voluntary scheme an unrealistic halfway position. When MMS finally proposed a mandatory Safety and Environmental Management Systems rule in May 2006, the proposal covered only 4 of the 12 widely accepted elements of industrial process safety management, and industry opposition killed even that. A comprehensive mandatory rule arrived only after the Macondo blowout, four years later. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

The inspection corps, what was left of it, could not physically cover the Gulf. After the spill, Secretary Salazar created an Outer Continental Shelf Safety Oversight Board to review MMS's management, and its September 2010 report found that the Pacific region employed 5 inspectors for 23 production facilities, about one for every five; the Gulf of Mexico region had 55 inspectors for about 3,000 facilities, one for every 54. Board interviews surfaced staff concerns about "a perceived emphasis on the quantity rather than quality of inspection," and the board concluded the Gulf district offices simply "did not have a sufficient number of engineers to efficiently and effectively conduct permit reviews." MMS had no formal bureau wide compilation of inspection rules and no comprehensive handbook for what its inspectors were supposed to do. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Washington's own post blowout review reached the same verdict from inside the machinery. The joint review panel found that MMS's regulations needed strengthening on cementing procedures and testing, blowout preventer configuration and testing, and well integrity testing, and that the agency's drilling inspections had never evaluated the emergency disconnect systems or the other backup functions of the blowout preventers it was charged with policing. Report Regarding the Causes of the April 20, 2010 Macondo Well Blowout - BOEMRE (2011-09-14)

Exemptions had a history of their own. Decades earlier, the Interior Department had declared that exploration plans in the central and western Gulf, and the drilling applications that followed them, were "categorically excluded" from environmental review under the National Environmental Policy Act, with an escape hatch for "extraordinary circumstances" involving uncertain or unknown environmental risks. In practice, the exception swallowed itself: MMS staff reported that leasing coordinators and managers discouraged findings that would increase the burden on lessees and cause, in the managers' phrase, unnecessary delays for operators. Deepwater drilling in a mile of water was treated, on paper, as a minor activity with no significant impact. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Approval bias ran through the science itself. MMS managers reportedly changed or minimized their own scientists' findings about potential environmental impacts in the review documents, to keep the plans moving; several of the agency's environmental scientists said their managers believed the result of an evaluation should always be a "green light" to proceed. In some cases, the commission found, employees' performance plans and monetary awards were tied to meeting deadlines for leasing and development approvals. The commission's own summary of the agency is the flattest and the harshest sentence in its report: "Ultimately, MMS was unable to ensure that its staffing capabilities and competencies kept pace with the changing risks and volume of offshore activity." Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01) Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

What this produced was a permitting machine. By law, the agency had to approve or reject an exploration plan within 30 days of submission, a clock that guaranteed rubber stamping in an office without the staff or technical depth to do anything else. Environmental review, where it happened at all, leaned on "categorical exclusions," exemptions from the National Environmental Policy Act meant for minor activities that can be assumed in advance to have no significant impact. BP's Macondo exploration plan, for a well in 5,000 feet of water drilled 13,000 feet into a high pressure reservoir, sailed through under one. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Agency staff said so afterward, in writing. A permitting official told the presidential commission that when BP applied to drill Macondo, "I did not know they were using nitrogen foamed cement. . . . [I]t would not have mattered under the regulations. We do not do any evaluations of types of cement." The same official could not recall being told why the well was not drilled to its proposed depth ("We do not need an explanation"), described learning the review process from a previous drilling engineer, and said he had never been trained on the wellhead equipment he was approving. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01)

Washington had been warned about the other half of the safety problem too, the blowout preventer. A second blind shear ram had been suggested to the Minerals Management Service as early as 2001, and by 2003 experts were also urging underwater robots able to operate the preventer and emergency backup systems to activate it. The agency did not require even a single blind shear ram until 2003 and never required a second. For a decade, studies and near misses accumulated showing that shear rams could fail, and the regulator whose job was to insist on a working fail safe did not insist. Regulators Failed to Address Risks in Oil Rig Fail-Safe Device - The New York Times (2010-06-21)

So when BP's Macondo plan arrived promising to drill the well safely, MMS did what it was built to do: it approved the plan, approved the drilling permits, approved the changes, and collected the money. The men on the rig believed, reasonably, that someone onshore was checking. The commission's verdict was that government regulators lacked the authority, the resources and the technical expertise to prevent what happened, which is a bureaucratic way of saying the watchdog was asleep, and had been fed well. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling - National Commission final report (2011-01) Regulators Failed to Address Risks in Oil Rig Fail-Safe Device - The New York Times (2010-06-21)