What the water left behind
12 November 2026
After the funerals and the camps came the audits, and the audits were not kind.
India's Comptroller and Auditor General ran a performance audit of the preparedness and response to the floods, covering 2014 to 2019, and reported to the legislature in November 2021. Among its headline findings: the Kerala State Water Policy of 2008 had never been updated in line with the National Water Policy and lacked provisions for flood control and flood management; and of 7,124 works of immediate repair and restoration approved under the State Disaster Response Fund after the 2018 flood, 18 percent remained incomplete even two years and eight months later, by April 2021. Report of the CAG on Preparedness and Response to Floods in Kerala, CAG of India (2021-11-11)
The audit confirmed in cold type what the amicus curiae had told the High Court in warm anger: reservoirs without flood cushions, dams without Emergency Action Plans, alerts without follow through. None of it was unknown in 2018. All of it was known by 2021 because two official documents forced it onto the record. Report of the CAG on Preparedness and Response to Floods in Kerala, CAG of India (2021-11-11)
To its credit, the state also built. The Rebuild Kerala Initiative, led by the Chief Minister, was born of the declared vision that the flood should be taken as a challenge and an opportunity to rebuild the state to ensure better standards of living to all sections of society; its Rebuild Kerala Development Programme laid out a roadmap for a Nava Keralam, a new Kerala, more resilient, green, inclusive and vibrant, across agriculture, fisheries, roads, water, urban services and disaster risk management. Rebuild Kerala Development Programme, Rebuild Kerala Initiative (2019-01-01)
Money for that rebuild came partly on credit: India signed the Resilient Kerala Program with the World Bank, aimed at climate and disaster resilience through a river basin conservation and management authority, a flood forecasting system and an integrated reservoir operation system for the Pamba basin. The programme runs from July 2021 to June 2026, at two levels: across the state, and in the districts along the Pamba river. Its two results areas are strengthening systems for resilience, and embedding resilience in the key economic sectors. The programme draws its outcomes from two of the state's own programmes: the Rebuild Kerala Development Program and the State Health Mission. Resilient Kerala Program, AIIB project summary (2021-07-16) Loan Agreement for Loan 9248 IN, The Resilient Kerala Program, World Bank (2021-06-29)
Dam operations, the soft underbelly of 2018, were formally rewritten. Kerala prepared rule curves for all major dams, constituted a multi agency committee in June 2021 to monitor operations when reservoirs reach orange alert levels or extreme rainfall is forecast, and prepared and tested Emergency Action Plans downstream of dams, the very documents whose absence the High Court's amicus had condemned. Dam Management, Kerala State Disaster Management Authority (2022-12-26)
At the national level, Parliament passed the Dam Safety Act, which came into force in December 2021, creating a National Committee on Dam Safety to evolve policy and a National Dam Safety Authority to implement it, with State Dam Safety Organisations beneath; the law covers dams over 15 metres high and makes dam owners answerable for construction, operation, maintenance and supervision. Because Mullaperiyar lies in one state and serves another, the dam falls, strictly speaking, under the NDSA's purview. Explained: Dam Safety Act and Mullaperiyar dam, The Hindu (2022-04-03)
In April 2022 the Supreme Court folded the old Mullaperiyar supervisory committee into the new architecture, reconstituting it with the powers of the National Dam Safety Authority until a regular NDSA became functional, making the Chief Secretaries of the two states liable for violations of the committee's directions, and ordering a fresh safety review of the 126 year old dam. Dr Joe Joseph v State of Tamil Nadu, Supreme Court of India (2022-04-08)
And still the hills kept their own calendar. In August 2019, twelve districts flooded again; between 8 and 20 August, 125 people died, nearly 80 of them in two landslides: Kavalappara in Malappuram, the biggest landslide tragedy in the state's history at 59 dead, and Puthumala in Wayanad, which took 17, two mud channels spreading wreckage over a two kilometre downhill stretch. Monsoon in Kerala: When hills tumbled, Frontline (2019-08-31)
On 6 August 2020, at 10.45 pm, a hillside above Pettimudi near Munnar gave way in rain, crashed through a kilometre and a half of valley, and crushed a settlement of tea estate workers living in 30 single room quarters. Of the 83 people living there, 12 were rescued; the dead included 31 members of one extended family, and 19 schoolchildren died or were never found. NDRF teams searched until 26 August and retrieved 65 bodies with other agencies. A look at how the Idukki landslide occurred, The Indian Express (2020-08-10) Landslide, Idukki, Kerala 2020, NDRF (2020-08-26)
The science, meanwhile, kept its nerve. The first formal climate attribution study of the 2018 flood found the deluge exceptionally less likely to be a product of warming: the results from multiple methods agreed: risk ratios for the rain and the flood ran from 0.31 to 0.82 and from 0.55 to 0.8 respectively; on its own return period arithmetic the 2018 rain was a 373 year event in today's climate but would have been a one in 88 year event without industrial warming, and the flood's streamflow, a 35 year event now, would have been a 26 year event in 1901's climate, the event found 12.3 percent less intense in the current climate, with the wet antecedent soil the primary driver, and a companion study reckoned the same rains would have been 18 percent heavier in a pre industrial world; future warming, it warned, may yet load the dice; in a country where every extreme now arrives wearing climate's colours, Kerala 2018 was the exception that checked the arithmetic. The honest lesson of Kerala 2018 is therefore not a slogan. It is an inventory: maps ignored, reports shelved, rivers narrowed, hills cut, dams run for power rather than protection, and a state that has spent the years since building the rules it did not have when the sky opened. The next 1924 is already on the calendar somewhere. Kerala's wager is that this time the paperwork holds. On the role of climate change in the 2018 flooding event in Kerala, Environmental Research Letters (2023-07-24)
For method, the audit reads like an autopsy roster: four test checked districts, Idukki chosen judgmentally for its maximum concentration of large dams, plus Alappuzha, Ernakulam and Thrissur; eight taluk offices; scrutiny from May 2019 to February 2020 across the Revenue and Disaster Management Department, the Water Resources Department, KSDMA, the State Emergency Operations Centre, IMD and the Kerala State Electricity Board. Its section headings alone read like a second indictment: obstruction to flood discharge through the Thottappally Spillway, a diversion canal for Chengalthodu found inadequate to prevent inundation, and a survey of affected families across the districts to test the state's account of its own performance. Report of the CAG on Preparedness and Response to Floods in Kerala, CAG of India (2021-11-11)
Its specific findings on readiness were granular. Only six rain gauges against the 32 required under existing BIS norms were available for rainfall estimation in the Periyar basin. Despite 275 flood forecasting stations set up by the CWC across the country by 2017, none had been set up in Kerala. A project to obtain real time rainfall and streamflow data had failed to deliver reliable data even after five years. Communication infrastructure was non functional in some areas, including dam sites, during or after the 2018 floods. Report of the CAG on Preparedness and Response to Floods in Kerala, CAG of India (2021-11-11)
On the dams themselves, the audit found that Idamalayar had no rule curve at all at the time of the floods, and Idukki's rule curve had been framed in 1983 and never reviewed until after 2018. Simulations showed that strict adherence to even that old curve would have spilled 558.19 million cubic metres against the actual 467.51, though outflows still exceeded inflows on 17 August at Idukki and on 16 and 17 August at Idamalayar. No capacity surveys or sedimentation studies were conducted in any KSEBL reservoir between 2011 and August 2019; Idukki, Idamalayar, Kakki and Sholayar had last been surveyed in 2004, 2011, 1999 and 2003 respectively, while Banasurasagar, commissioned in 2005, had never been surveyed at all. Siltation assessments of Water Resources Department reservoirs found Aruvikkara 43 percent silted, Mangalam 21.98 percent and Peppara 21.70 percent, with desiltation begun only at Mangalam in December 2020. Report of the CAG on Preparedness and Response to Floods in Kerala, CAG of India (2021-11-11)
Kerala's own reply to the auditors became a list of what the flood had taught: a full fledged inflow forecasting and flood early warning system under the National Hydrology Project across all river basins, with real time monitoring through 99 tipping bucket rain gauges, 56 radar level sensors and 13 automatic weather stations, and a single authoritative platform, the Kerala Water Resources Information System; a revised State Water Policy with flood management provisions was drafted by a committee and submitted on 5 April 2021. Report of the CAG on Preparedness and Response to Floods in Kerala, CAG of India (2021-11-11)
Restoration showed the state's better face too. The Kerala State Electricity Board put its infrastructure losses at Rs 350 crore apart from Rs 470 crore of revenue loss, with 50 sub stations, 16,158 transformers and 25.6 lakh connections hit; by 24 August it had restored 23.36 lakh of those connections, repaired 41 of the 50 defunct sub stations and reconnected 14,314 transformers, with 120 skilled staff sent by Telangana's electricity board to help. Rebuilding Kerala: Power cuts, damaged roads, destroyed houses and people fighting trauma, The Indian Express (2018-08-25)
In Chendamangalam, the looms came back one CSR cheque at a time: a district committee channelled corporate social responsibility funds from Cochin's big industrial names into repairs, about 40 percent of the looms were reinstated by November, and the H47 cooperative resumed weaving in the second week of October after students of a private Kochi school raised Rs 1.3 lakh to repair 28 of its 30 looms. Three months after Kerala floods, Chendamangalam starts weaving a new life, but challenges remain, The Indian Express (2018-11-14)
Brick and mortar kept moving for years under the Rebuild Kerala Initiative; its public dashboard records administrative sanction of Rs 128.27 crore for the reconstruction of 111 flood damaged village offices across the districts, one line item in a programme that stretched from housing to hazard mapping. Rebuild Kerala Initiative, Government of Kerala (2026-10-18)
Quiet impatience marked the Supreme Court's 2022 order: "We express a sanguine hope that the competent authority may take appropriate steps to ensure that the regular NDSA under the 2021 Act is established at the earliest, as it cannot brook delay." Dr Joe Joseph v State of Tamil Nadu, Supreme Court of India (2022-04-08)
Pettimudi's mechanics were a case study of everything 2018 had taught no one: the slide began in a shola forest region inside Eravikulam National Park on a slope the Kerala Geology Department measured at 40 degrees, where anything above 20 degrees is vulnerable to slipping in heavy rain; rocks, slurry and sludge travelled about a kilometre and a half into the valley quarters of the Kanan Devan Hills Plantations workers. A look at how the Idukki landslide occurred, The Indian Express (2020-08-10)
And the 2019 slides had shown the interim's cost: at Puthumala in Wayanad, 63 houses, a temple, a mosque, a post office and a dispensary were swept away or buried within minutes along with 17 people; at Kavalappara near Nilambur, bodies were recovered 6 to 7 kilometres downstream days later, some identifiable only after DNA tests. Monsoon in Kerala: When hills tumbled, Frontline (2019-08-31)
Explained when it came into force in December 2021, the Dam Safety Act's design covers dams over 15 metres high, and those between 10 and 15 metres under certain stipulations, mandates surveillance, inspection, operation and maintenance for the prevention of dam failure disasters, and creates two national institutions, a National Committee on Dam Safety and the National Dam Safety Authority, to give the rules an institutional spine. Explained: Dam Safety Act and Mullaperiyar dam, The Hindu (2022-04-03)
Covering 2014 to 2019 and published in 2021, the comptroller and auditor general's performance audit, read like a bill of particulars against the warning chain. A project meant to supply real time data on rainfall and streamflow failed to deliver reliable real time data even after five years; the State Emergency Operations Centre's decision support system, meant to predict and give early warning of major hydro meteorological hazards, could not be relied upon even two years after its April 2019 completion target, because the external real time data it depended on had yet to arrive. Report of the CAG on Preparedness and Response to Floods in Kerala, CAG of India (2021-11-11)
None of this happened on ground that was secretly safe: the National Centre for Earth Science Studies estimates that 14.52 percent of Kerala's total area is prone to floods, and the audit itself notes that flood plain occupancy and the reclamation of water bodies and wetlands over the years have steadily increased the damage each flood can do. Report of the CAG on Preparedness and Response to Floods in Kerala, CAG of India (2021-11-11)
Money sanctioned is not money spent, and the audit caught that gap too. Between August 2018 and June 2019 the revenue and disaster management department sanctioned Rs 891.85 crore to various departments for flood expenses; the Water Resources Department, the nodal department for flood preparedness, was sanctioned Rs 536.27 crore, and its apex committee approved 7,124 works worth Rs 515.51 crore, rectifying regulator cum bridges, clearing canals, removing silt and debris. By January 2020, only 1,406 of those works, 20 percent, worth Rs 49.47 crore, had been completed, and by April 2021, two years and eight months on, works the State Disaster Response Fund rules say must be of immediate nature were still unfinished, leaving the same canals and structures to face the next monsoon unready. Report of the CAG on Preparedness and Response to Floods in Kerala, CAG of India (2021-11-11)
August 2019 supplied the stress test. Between 8 and 20 August 2019, 125 people died in fresh floods and landslides; nearly 80 of them died at just two sites, Kavalappara in Malappuram, with 59 dead the biggest landslide tragedy in the state's history, and Puthumala in Wayanad, where ground penetrating radar proved futile against the mud and some of the missing were never recovered at all. Monsoon in Kerala: When hills tumbled, Frontline (2019-08-31)
Its second pillar insisted that rebuilding happen at the right location, away from flood plains and slopes, with disaster resilient technique; it noted that Kerala already hosts about 40 organisations working on alternative housing technologies, from the Laurie Baker tradition through COSTFORD to the government sponsored Nirmiti, and observed that if each were entrusted with 500 houses, the 18,000 houses needed could stand within six months, before the next monsoon. It recommended an integrated strategic environmental assessment, the UN Environment approach used after conflict in Sri Lanka and after disaster in Nepal, to keep the reconstruction boom itself from becoming the next ecological problem. Kerala Post Disaster Needs Assessment, Government of Kerala and United Nations (2018-10-26)
Money for that rebuild kept arriving in phases. The World Bank had sanctioned 250 million dollars for the first phase of the Rebuild Kerala Initiative, its agreement signed in June 2019, alongside 170 million euros from the German development bank; in June 2021 the Bank approved another 125 million dollars, about Rs 925 crore, for the second phase, clearing the way for a matching 125 million from the Asian Infrastructure Investment Bank and talks with the French Development Agency for 100 million euros more, with the first phase having helped the state draft a River Basin Conservation and Management Act and introduce climate resilient agriculture and risk informed land use planning. World Bank sanctions Rs 925 crore loan for second phase of Rebuild Kerala Initiative, The New Indian Express (2021-06-26)
Its disaster risk reduction vision for what it called Nava Keralam was blunt in target if not in timetable: zero mortality from disasters, with minimum economic loss and disruption, through a revived State Disaster Response Force, more efficient fire and police response, robust early warning and risk communication that actually changes behaviour. Kerala Post Disaster Needs Assessment, Government of Kerala and United Nations (2018-10-26)
Livelihood recovery was to be built the same way: emergency employment through cash for work, special compensation packages for Kudumbashree members, insurance products for climate resilient agriculture, green jobs and skill development as the medium term answer to the 45 days of lost wages the informal workforce had just absorbed. Kerala Post Disaster Needs Assessment, Government of Kerala and United Nations (2018-10-26)
On climate, the assessment chose its words with care: the floods cannot be exclusively attributed to climate change, it said, but climate predictions do forecast increases in rainfall intensity for Kerala, and between the 2018 floods and Cyclone Okhi the year before, the state had been served two warnings about the kind of extreme event it should expect more often; its recovery strategy accordingly called for a comprehensive post disaster environmental assessment, asbestos management to international standards, and sand removal from rivers only after site specific studies. Kerala Post Disaster Needs Assessment, Government of Kerala and United Nations (2018-10-26)
The proof of a lesson is the next identical test, and 2022 supplied it. That August brought rainfall patterns and inflows comparable to 2018, but the storages of most dams stayed below the 90 percent mark through the month instead of spiking abruptly to 100 percent in mid August as they had four years earlier, and spills, the unplanned surplus that serves no irrigation purpose, stayed sporadic. The instrument was a concept Kerala's dam managers call the Upper Rule Level: a dynamic flood cushion below Full Reservoir Level, raised in small steps as the monsoon progresses, with the reservoir allowed to approach full capacity only by the end of both monsoons, and any heavy spell that pushes the level above the rule line answered by slow discharge over a couple of days. At Idukki in the first flood of August 2022 the level did cross the line and was brought back by exactly that method, the heavy inflow held in the cushion while the river was in spate and released as the river depleted. Learning from 2018 floods, here's how Kerala managed dams better in 2022, The Hindu (2022-08-27)
Behind that discipline sits the year's most consequential shift: Kerala's own dam managers observe that the timing of extreme events has migrated, mostly mid July once, then late July, and now August, with even ordinary rainfall peaks concentrated in August, which means a rule curve written for the monsoon of the last century is a schedule for a climate that no longer exists. Learning from 2018 floods, here's how Kerala managed dams better in 2022, The Hindu (2022-08-27)
Come November 2018 and the rebuild had its own institution, the Rebuild Kerala Initiative, floated to shepherd post flood reconstruction, an arm meant to cut through the delays that rebuilding usually drowns in; institutions are how governments apologise to the future. Rebuild Kerala Initiative, Government of Kerala (2026-10-18)
Asked at the exit conference in early 2021 why works meant to be immediate were still incomplete, the government answered that the small cost of most works had forced retendering, and that another flood had lashed the state during implementation; by November 2020 it said 63 percent of the approved works had been undertaken and 49 percent of the money spent, an admission the audit recorded alongside its recommendation that such works be monitored to completion on priority. Report of the CAG on Preparedness and Response to Floods in Kerala, CAG of India (2021-11-11)
Technology carried the recovery's paperwork too: the assessment records how the keralarescue application and WhatsApp groups run by volunteers and officials alike functioned in many locations as virtual control rooms, how the Rebuild Kerala app was used to assess damage to houses and buildings as the basis for compensation, and how the same toolkit could geo tag beneficiaries, recover lost documents and run social audits. Kerala Post Disaster Needs Assessment, Government of Kerala and United Nations (2018-10-26)
Its inclusion agenda was equally specific: men and women should hold joint title deeds for newly constructed homes, migrant workers and transgenders should be proactively brought inside social security, grama sabhas should be strengthened, and concurrent social audit and grievance redress should be built into every recovery programme. Kerala Post Disaster Needs Assessment, Government of Kerala and United Nations (2018-10-26)
At Pettimudi, two NDRF teams worked the debris from 7 August to 26 August alongside other agencies; of the 65 bodies recovered in all, the force retrieved 48 and the other agencies 17, a division of the grimmest labour that says everything about who does this work in India. Landslide, Idukki, Kerala 2020, NDRF (2020-08-26)
Green jobs were the assessment's recurring chord, down to a proposal for village level green technology centres, run as cooperatives, where trained young people would install and maintain household composting, sewage management, solar and recycling systems and create skilled employment in the process. Kerala Post Disaster Needs Assessment, Government of Kerala and United Nations (2018-10-26)
By 19 August 2019 the second spell's toll had risen to 121 with 40 injured, a summer that began with red alerts across districts that had spent the previous year being told the lessons of 2018 had been learned. Death toll in flood hit Kerala rises to 121, 40 injured, India Today (2019-08-19)
Frontline's correspondent, standing at Puthumala, described an island of untouched greenery stranded between two mud red channels of debris, the image that should hang in every office that clears a quarry, cuts a slope or sits on a rule curve. Monsoon in Kerala: When hills tumbled, Frontline (2019-08-31)
Correspondingly plain was the audit's recommendation: the government should put in place a system of periodic monitoring of works of immediate nature funded by the State Disaster Response Fund, so that sanctioned works are completed on priority, given what it delicately called the state's increasing vulnerability to severe flooding events. Report of the CAG on Preparedness and Response to Floods in Kerala, CAG of India (2021-11-11)
Social media's second shift came after the rescue: the same channels that had located the stranded were used to mobilise thousands of volunteers for one time cleaning operations across the flooded towns, the unglamorous sequel that decides how fast a place becomes livable again. Kerala Post Disaster Needs Assessment, Government of Kerala and United Nations (2018-10-26)
A flood like this is never really one event: it is the rain, the rule curve, the quarry, the affidavit, the rescue, the audit and the memory, arriving in that order and staying in reverse. What Kerala does with the interval before the next one is the only part of the story still being written. The water will be back; it left no forwarding address; the next monsoon is already on the calendar.