Water, chloroform and the argument about blame
Published 15 October 2026
The IChemE article concluded that between 450 and 900 kilograms of water had got into a tank of MIC that was contaminated with chloroform. It proposed two routes for the water. Either someone added it, inadvertently or deliberately, through the nitrogen pressurisation line, which sat near a water supply, or it came through the process filter lines that were being washed with water shortly before the leak and had not been fitted with slip plates, contrary to normal practice. The company noted that the fact 610 could not be pressurised before the incident suggested there was a leak, and that the route of the nitrogen leak was probably the route of the water. [33]
The chloroform has its own story in the IChemE account based on Carbide's report. Between 18 and 22 October the MIC refining still was operated at a higher than usual temperature, and MIC with a chloroform content of 12 to 16 percent, against a specification of 0.5 percent at most, was sent into tank 610 rather than to the off specification tank. Samples taken on 5 and 9 December found contaminated product in the transfer lines to the derivatives unit. The UCC derived account includes these details. Its report lists the high temperature, the wrong tank and the contaminated lines as events in the sequence. [33]
The CSIR team reached numbers of its own, and the figures are specific enough to be checked. From the residue, it estimated that 12,087 kilograms of MIC and 595 kilograms of chloroform had reacted with 512 kilograms of water, producing a residue that included 6,964 kilograms of MIC trimer and 2,675 kilograms of dimethyl isocyanurate. The same report estimated the tank's residue at about 12.5 tonnes. The team reproduced the chemistry in the laboratory, heating MIC from tank 611 with water and traces of ferric salts in sealed tubes, and found that most of the products in the residue appear at up to 200 degrees, with the rest needing more heat. [8]
Then the CSIR report parts company with Carbide, and the split matters for liability. Water alone, about 500 kilograms of it, the report says, would have reacted with only three or four tonnes of MIC and brought the tank gradually to about 70 degrees, below the boiling point of MIC at the relief valve's pressure. A violent rise needed metal catalysed trimerisation to be under way. The team pointed to sodium in the residue at 50 to 90 parts per million, which suggests alkali got in, possibly from the scrubber accumulator. It also pointed to the tank sitting near atmospheric pressure from 22 October, which gave metal contaminants a chance to enter, and to the water washing of choked filters in the relief valve vent header. That water, perhaps mixed with alkali, could have carried metal from the carbon steel pipework into a tank no longer under nitrogen. [8]
On chloroform the two reports are almost opposites. Carbide gave chloroform a leading role in the reaction, saying it decomposed to yield chloride ions and that the resulting mixture was corrosive to the tank. The CSIR report says in terms that the presence of chloroform had no influence on starting or speeding the runaway reaction. And on the question of whose fault it was, the CSIR report offers its own verdict. The conditions for the accident, it said, were inherent and extant, and some inputs of integrated scientific analysis of the chemistry, design and controls would have avoided or lessened considerably the extent of damage. [8]
There was a third theory, and the Supreme Court recorded it in 1991, almost as an aside. The Court noted that at one point in time UCC itself had recognised the possibility that the accident had been the result of acts of sabotage. It used the remark to make a different point, which was that offences arising out of a disaster of this size should not remain unexamined, and that the Union of India's shifting stand should not lead to a miscarriage of justice. The trial court that finally sentenced the managers in 2010 decided the case on design, maintenance and warning. [11] [6]
The remaining MIC had to go somewhere. Tank 611 held about the same quantity as 610, and the CSIR team called it a serious hazard. Under a plan called Operation Faith, the stock in the plant was processed between 16 and 22 December 1984. The IChemE article says all remaining MIC had been converted to carbaryl insecticide by 22 December. Which means the plant that killed thousands then spent its last working days doing the one thing it was built to do, turning MIC into Sevin. [8] [33]