What the government's own scientists measured
Published 15 October 2026
A June 2010 report followed a government commission in March 2009, on the directions of the task force set up by the Madhya Pradesh High Court. The National Environmental Engineering Research Institute at Nagpur and the National Geophysical Research Institute at Hyderabad did the field work between April 2009 and May 2010, and the report is dated June 2010. It states the history plainly: Union Carbide India made carbamate pesticides and intermediates at Bhopal from 1969 to 1984, dumped solid, semisolid, liquid and tarry wastes inside its premises, and the contamination of soil and groundwater in and around the site is "solely due to dumping of various wastes during 1969 to 1984", and the gas tragedy has no relevance to it. [54] [53]
The report's picture of the site is not tidy. The team found most plant, machinery and buildings dilapidated and probably contaminated, the boundary wall broken in many places and open to people living nearby, and a number of dumps left in Disposal Areas I and II, which told them that the 2005 clean up by the state pollution board and its contractor had been incomplete. That clean up had recovered only small quantities by the board's own report: 165 tonnes of contaminated soil, 11 tonnes of Sevin residue, 142.8 tonnes of semiprocessed pesticides and 39.6 tonnes of lime sludge. The total area of waste disposal was put at 6.9 hectares, and the solar evaporation pond area outside the wall held one pond and an abandoned landfill, both damaged. [54]
The sampling was done in a stated grid. The geophysicists surveyed nine sites and found signs of contamination at three, Sites I, III and V, to about two metres, with one dump, Site III, possibly four to eight metres deep. Five boreholes were drilled next to suspected dumps, near the Temik and formulation plant, near the MIC storage and water treatment plant, in Disposal Area II on the eastern side, near the storage tanks, and near the Naphthol plant, with soil samples at depths from 0.3 metres down to 32 metres, where water was found. Another 27 soil samples were taken from suspected hot spots on the premises, and groundwater from wells and borewells at distances from about 0.22 to 2.76 kilometres, including a Garib Nagar handpump beside the pond, a Sunder Nagar borewell and Shiv Nagar handpumps. The contaminants it found in soil were BHC, aldicarb, carbaryl, alpha naphthol and mercury, to about two metres. [54]
NEERI and NGRI found black and yellow silty clay from the surface down to 22 to 25 metres, with very low permeability, over a confined aquifer below about 25 metres, with groundwater generally flowing east to north east. On that basis the team concluded that groundwater was in general not contaminated by seepage from the dumps. It did find isolated contamination with pesticides, and in some cases dichlorobenzene, in five wells close to the premises on the north east and east sides, and attributed it to surface runoff from the dumps, not to leaching, because of the clay layer. The quantity of contaminated groundwater, it said, could not be estimated because the contamination was isolated. [54]
The remedies they proposed are specific. The immediate measures were fencing and security for the site and the pond area, immediate sealing of the five contaminated wells, excavation of the dumps with incinerable waste going to the treatment and disposal facility at Pithampur and the rest to a secured landfill to be built on the site, and decontamination and decommissioning of the plant, machinery and buildings before the soil work. They estimated the soil to be treated at 6,50,000 cubic metres, about 11,00,000 tonnes, from about 16 hectares on the premises (3,20,000 cubic metres), the pond and landfill area outside (2,80,000 cubic metres) and deeper pockets (50,000 cubic metres), and estimated construction of the secured landfill at Rs 78 to 117 crore, an average of Rs 100 crore, subject to variation with pretreatment needs. For groundwater they proposed pump and treat at a capital cost of Rs 25 to 30 lakh and running costs of Rs 10 to 15 lakh a year. [54]
The report also says how it judged what counted as contaminated. The 2010 report said India then had no notified clean up standards for hazardous waste sites, so it used the United States Environmental Protection Agency's screening levels of December 2009, choosing the soil figures that protect groundwater. In those tables the level for carbaryl is 3.3 milligrams per kilogram, aldicarb 0.09, alpha HCH 0.000062, beta HCH 0.00022, lindane 0.00036 and elemental mercury 0.03. For groundwater the clean up level was the background concentration of those substances in surrounding water and soil, which it described as practically zero. It also notes that the work was limited because the plant, buildings and bush had not been cleared before the study began, as its terms of reference had required, so the open ground around those structures, about nine hectares, was not sampled and is assumed contaminated. [54]