The countdown for STS 107 ran about twenty four hours longer than a standard shuttle countdown, stretched by the work of loading cryogens for the Extended Duration Orbiter pallet that would make electricity and water for sixteen days, and by the final stowage of plants, insects and other living cargo in the Spacehab module. Spacehab stowage fell about ninety minutes behind, but the count had recovered by the time the communication checks closed out at launch minus twenty four hours. CAIB Report Vol. 1: 2.3 Launch Sequence (2003-08-26)

None of the open items in those last days was foam. At the pre launch Mission Management Team meeting on 14 January, the open business was test data for the Ball Strut Tie Rod Assembly; at the Delta review a day later it was strontium chromate contamination found on a spacesuit that was not even flying, cleared by toxicology; and at the pre tanking meeting after midnight on the 16th it was the attachment ring between booster and tank, whose ring plates had come back from testing below minimum static strength, the program waiving its 1.4 safety factor on analysis of the loads this particular flight would see. Propellant loading then ran seventy minutes late over an extended fuel cell calibration, a balky liquid oxygen replenish valve and a reconfiguration of the launch processing system. At T minus nine minutes the launch team was polled seat by seat; every console answered go. On launch day the orbiter's computers were fed the morning's measured winds and atmosphere, the data that shape the ascent's steering targets, and even the boosters behaved: no two solid rockets ever burn exactly alike, and the thrust mismatch that morning sat well inside the flight control system's margins. CAIB Report Vol. 1: 2.2 Flight Preparation (2003-08-26) CAIB Report Vol. 1: 2.3 Launch Sequence (2003-08-26)

Seven hours and twenty minutes before launch, ground crews began pumping more than 1.5 million pounds of liquid oxygen and liquid hydrogen into the External Tank. At about 6:15 a.m. the Final Inspection Team began its visual and photographic walk of the pad and vehicle; frost noted during earlier inspections had dissipated by 7:15, when the Ice Team finished its survey. Nothing in the atmosphere above the Cape surprised anyone either. Before a launch, balloons go up to measure winds as high as 50,000 to 60,000 feet, and Doppler sounders build the wind profile the flight controllers will fly against; for STS 107 that profile was unremarkable, relatively constant through the lower altitudes. CAIB Report Vol. 1: 2.3 Launch Sequence (2003-08-26)

Heavy rain had fallen on the Kennedy Space Center while the stack stood on the pad, but launch day itself was mild: 65 degrees, calm winds, scattered clouds at 4,000 feet, seven miles of visibility, and the abort landing sites in Spain and Morocco all within limits. CAIB Report Vol. 1: 2.3 Launch Sequence (2003-08-26)

The crew rode out to Launch Complex 39 A at about 7:30 a.m. Husband was first through the hatch, boarding at the 195 foot level of the launch tower at 7:53; Chawla was last, at 8:45. The hatch was closed and locked at 9:17. CAIB Report Vol. 1: 2.3 Launch Sequence (2003-08-26)

At 10:10 the clock went into its planned hold at T minus twenty minutes while the ascent software was switched to launch configuration; non essential personnel cleared the pad area at 10:16. The count came out of the T minus nine minute hold, the go for auxiliary power unit start came at 10:35, and at 10:39 a.m. on Thursday, 16 January 2003, the solid rocket boosters ignited and Columbia rose on the first shuttle mission of the year, on time, into a sky that gave no one anything to complain about. CAIB Report Vol. 1: 2.3 Launch Sequence (2003-08-26) STS-107 - NASA

Fifty seven seconds into the flight, as the stack passed through 32,000 feet in the period of maximum dynamic pressure, Columbia flew through a wind shear, a rapid change of minus 37.7 feet per second in the crosswind over a 1,200 foot band of altitude. The wind vector pushed on the left side of the stack, driving the vehicle's sideslip angle to minus 1.75 degrees by the sixty second mark and increasing the aerodynamic force on the External Tank's forward bipod attachment. Later reconstruction showed those loads were larger than normal but within design limits. CAIB Report Vol. 1: 2.3 Launch Sequence (2003-08-26)

Wind shear had a second effect: it set the liquid oxygen in the tank sloshing, starting a very low frequency oscillation that peaked at seventy five seconds and persisted until booster separation at 127 seconds, fed by two weaker shears at 95 and 105 seconds. A little slosh is ordinary on ascent; on STS 107 the amplitude was larger than normal and it lasted longer. Booster and main engine nozzles swung through deflections that exceeded anything recorded on previous flights, in places by a factor of 1.4, as the flight control system muscled the stack back into line. Every one of these reactions stayed within the system's design margins, and a post accident reconstruction validated by the onboard data recorder showed wing loads at roughly 70 percent of their design limit or less throughout the climb. CAIB Report Vol. 1: 2.3 Launch Sequence (2003-08-26)

Two things about that climb deserve a second look. On launch day the orbiter's general purpose computers are updated with what controllers call I loads, initializing data sets built for each mission from measured winds, atmospheric data and the vehicle's configuration, and from them the computers fly targets for angle of attack, sideslip and dynamic pressure keyed to Mach number, so that structural loads stay acceptable. And STS 107 was flying the Performance Enhancements profile, a package of flight software and trajectory changes introduced in late 1997 on STS 85 that let the shuttle lift some 1,600 pounds of extra payload toward the station; a modified version had flown every mission since. When analysts later chased the record nozzle deflections past the two minute mark, they traced them to a lower than expected booster burn rate, a thrust mismatch between the two boosters, and trim behavior peculiar to that profile. CAIB Report Vol. 1: 2.3 Launch Sequence (2003-08-26)

At 81.7 seconds after launch, one large piece and at least two smaller pieces of insulating foam separated from the ramp over the tank's left bipod fitting. About 0.161 seconds later, at 81.9 seconds and 65,860 feet, the large piece struck the underside of Columbia's left wing, in the region of reinforced carbon carbon panels five through nine. No one saw it. The event appears in no one's real time record of the launch; it lived only on film and video that engineers would not review until the next day. CAIB Report Vol. 1: 2.3 Launch Sequence (2003-08-26) CAIB Report Vol. 1: 3.4 Image and Transport Analyses (2003-08-26)

How could less than two pounds of foam cripple a wing? The physics deserves stating plainly. Just before separating, the foam was traveling with the stack at about 1,568 miles per hour; once free, being a very low density object with almost no ability to hold its speed in the airstream, it slowed to about 1,022 miles per hour in that same 0.161 seconds. The orbiter did not slow down. In essence, the accident board explained, the foam stopped and the ship ran into it, at a relative velocity of about 545 miles per hour. CAIB Report Vol. 1: 3.4 Image and Transport Analyses (2003-08-26)

Photogrammetry done the day after launch put the big piece at roughly twenty one to twenty seven inches long and twelve to eighteen inches wide, tumbling at least eighteen times a second, flat and relatively thin. The cameras' slow frame rates made the speed estimates elastic: a twenty inch error in fixing the foam's position near impact would swing the computed closing speed from 675 to 825 feet per second. A later transport analysis, which traced the fragment's path through the computed airflow around the stack, settled on a representative projectile nineteen inches by 11.5 inches by 5.5 inches, weighing 1.67 pounds, with a density of 2.4 pounds per cubic foot: about the size and weight of a large carry on suitcase filled with nothing at all. The two analyses constrained each other: the ballistic coefficient, the tug of war between an object's weight and its drag, governed how fast the foam shed speed, and only a narrow band of sizes, shapes and densities could match both the pictures and the physics; their overlap became the "best fit" box from which the test projectile was chosen. CAIB Report Vol. 1: 2.3 Launch Sequence (2003-08-26) CAIB Report Vol. 1: 3.4 Image and Transport Analyses (2003-08-26)

Two cameras produced the best evidence of the strike: a 35 millimeter film camera designated E212, seventeen miles from the pad, and a video camera, E208, twenty six miles away. Their images, sharpened by Lockheed Martin and the National Imagery and Mapping Agency, let analysts fix the time of impact, its altitude, and its velocity, and refined the impact area to less than twenty square feet spanning panels six through nine and the carrier panels and tiles adjacent. CAIB Report Vol. 1: 3.4 Image and Transport Analyses (2003-08-26)

Everything else that might have seen more was blind. Launch cameras were a legacy of earlier programs, their placements wrong for the shuttle's newer flight profiles; on 16 January, some cameras were not operating, and at least one was out of focus. There were no high resolution, high speed cameras on the critical areas and no requirement in the launch commit criteria that working cameras track the vehicle through booster separation. A final Ice Team camera scan about five minutes before launch did confirm one thing: there was no ice on the bipod ramp. CAIB Report Vol. 1: 3.4 Image and Transport Analyses (2003-08-26)

Everything after that was flawless. Two minutes and seven seconds after liftoff the boosters separated and parachuted into the Atlantic for recovery; eight and a half minutes in, the main engines shut down on cue and the External Tank fell away. At 11:20 a.m. a two minute burn of the orbital maneuvering engines settled Columbia into its working orbit. CAIB Report Vol. 1: 2.3 Launch Sequence (2003-08-26)

Back at the Cape, the launch team logged a clean flight. On the mission's second day, engineers doing the routine review of launch photography spotted it: at about eighty two seconds into the flight, a piece of foam insulation broke from the External Tank and appeared to strike the left wing. It was the kind of thing that had been seen on shuttle launches for twenty years, and it was about to become the only thing that mattered. 20 Years Ago: Remembering Columbia and Her Crew - NASA History (2023-01-26)