Named for a river
3 November 2026
The ship took its name from a Boston sloop commanded by Captain Robert Gray, who in May 1792 was sailing the Pacific Northwest when he noticed muddy water fanning out from the shore and went looking for what he called the Great River of the West. Gray worked the Columbia past the sand bar at the river's mouth, named the river for his ship, traded with the local tribes for a week, and then sailed on without exploring where the river led, taking his vessel and its cargo of otter skins to Canton and home to Boston in 1793, a voyage the report describes as the first American circumnavigation of the globe. Nearly two centuries later the name went on the first of NASA's space shuttles. CAIB Report Vol. 1: 2.1 Mission Objectives and Their Rationales (2003-08-26)
Columbia, designated Orbiter Vehicle 102, first flew on 12 April 1981, and in doing so became the first spacecraft of its type to fly in Earth orbit; it completed twenty seven missions over the two decades that followed. Its younger sisters arrived through the 1980s: Challenger in 1983, Discovery in 1984, Atlantis in 1985, and Endeavour, built to replace Challenger, in 1992. By January 2003, Columbia was the oldest orbiter still flying. CAIB Report Vol. 1: Board Statement (2003-08-26) CAIB Report Vol. 1: 2.1 Mission Objectives and Their Rationales (2003-08-26) CAIB Report Vol. 1: 6.1 A History of Foam Anomalies (2003-08-26)
Age brought quirks. Columbia was the last orbiter still fitted with its original internal airlock on the middeck; the others had been modified with external docking mechanisms for flights to Mir and the International Space Station. Because the airlock did not eat into the payload bay, Columbia could carry payloads that ran the bay's full length, like the Chandra X ray telescope, though the arrangement made its middeck more cramped than its sisters'. CAIB Report Vol. 1: 2.1 Mission Objectives and Their Rationales (2003-08-26)
Weight mattered more. Columbia had been manufactured to an early structural standard, and its airframe was heavier than the later orbiters'; combined with a center of gravity pushed forward by that internal airlock, it could not lift as much payload to orbit as the rest of the fleet. That made it the least desirable shuttle for station assembly work, and so through the 1990s Columbia became the agency's science ship, flying extended duration missions with pressurized Spacelab and Spacehab modules in its payload bay while the other orbiters docked and built. Planning was nevertheless under way to modify Columbia for a station flight after STS 107: in 2002 the manifest was revised to install a docking adaptor in the old orbiter so it could fly an October 2003 station resupply mission, a job its weight made it a poor fit for, assigned because Discovery was tied up for eighteen months of major maintenance. CAIB Report Vol. 1: 5.7 The Return of Schedule Pressure (2003-08-26) CAIB Report Vol. 1: 2.1 Mission Objectives and Their Rationales (2003-08-26)
The mission that became STS 107 began life in June 1997, when the Flight Assignment Working Group at the Johnson Space Center designated the flight, then tentatively scheduled for the third quarter of fiscal year 2000, a research module mission. A month later, committees of the National Academy of Sciences' Space Studies Board wrote to NASA administrator Daniel Goldin recommending that the agency dedicate several future shuttle missions to microgravity and life sciences, to train scientists to exploit the station's research capabilities and to bridge the gap between the last shuttle science flight and the start of research on orbit. CAIB Report Vol. 1: 2.1 Mission Objectives and Their Rationales (2003-08-26)
Goldin announced the mission in March 1998, modeled on STS 90, the Neurolab flight, with a tentative launch in May 2000. Congress put money behind it that October, adding $15 million to NASA's budget after expressing concern about the scarcity of shuttle based science, and reserved $40 million the following year for a second science mission that NASA would cancel in October 2002, folding the funds back into STS 107. CAIB Report Vol. 1: 2.1 Mission Objectives and Their Rationales (2003-08-26) 20 Years Ago: Remembering Columbia and Her Crew - NASA History (2023-01-26)
Politics shaped the manifest. The Mediterranean Israeli Dust Experiment came aboard with an Israeli astronaut as part of a cooperative effort in the tradition NASA had begun in the early 1980s, and an Earth observing satellite called Triana was added to save the agency from buying a commercial launch for it; when political disagreements between Congress and the White House stalled Triana, it was pulled and replaced by FREESTAR, the Fast Reaction Experiments Enabling Science, Technology, Applications, and Research package, a pallet of experiments mounted behind the Spacehab module. CAIB Report Vol. 1: 2.1 Mission Objectives and Their Rationales (2003-08-26)
Then the schedule slipped, and slipped, and slipped. STS 107 was formally scheduled for launch on 11 January 2001; it flew on 16 January 2003, after thirteen delays over two years, most of them caused by other missions taking priority long before Columbia was ever configured for flight. Three events did the most damage. Triana's removal forced a remanifest. Columbia's depot level maintenance ran six months long, largely over problems with its Kapton wiring, and the delay let the STS 109 Hubble servicing mission, judged more urgent, jump ahead in line. CAIB Report Vol. 1: 2.1 Mission Objectives and Their Rationales (2003-08-26)
Worst was the fleet itself. About a month before a planned 19 July 2002 launch, NASA grounded all four orbiters over cracks discovered in the flowliners, the liners inside the main propellant feed lines that smooth the flow of fuel into the main engines' low pressure turbopumps; found first on Atlantis, the cracks turned up on every orbiter and had to be fixed by welding and polishing. The four month grounding squeezed the station's crew rotation, and to hold the assembly sequence together while bringing the Expedition 5 crew home, NASA launched STS 112 and STS 113 ahead of STS 107. After the accident, the board's staff read Columbia's maintenance history end to end: the flow records of its recovery from STS 109 and its preparation for STS 107, and the agency's Problem Reporting and Corrective Action database, which for the orbiters held 16,500 Work Authorization Documents comprising 600,000 pages and 3.9 million individual steps. Nothing in any of it, not the wiring repairs, not the lost and found item logs, not the readiness reviews, pointed at the left wing. CAIB Report Vol. 1: 2.1 Mission Objectives and Their Rationales (2003-08-26)
And the science mission, the one flight that year with no station to visit, absorbed the queue's pain. CAIB Report Vol. 1: 2.1 Mission Objectives and Their Rationales (2003-08-26) CAIB Report Vol. 1: 1.5 The Challenger Accident (2003-08-26)
What finally flew was a self contained research expedition: sixteen days alone in orbit, inclined 39 degrees to the equator about 175 miles up, with a Spacehab Research Double Module full of experiments in the payload bay, joined to the crew cabin by a long access tunnel, the FREESTAR pallet mounted behind it, and an Extended Duration Orbiter pallet of extra cryogenics to stretch the ship's endurance. It was the first shuttle mission dedicated to microgravity research in nearly five years, and the only one of six shuttle flights planned for 2003 that would not visit the station. CAIB Report Vol. 1: 2.2 Flight Preparation (2003-08-26) CAIB Report Vol. 1: 2.3 Launch Sequence (2003-08-26) 20 Years Ago: Remembering Columbia and Her Crew - NASA History (2023-01-26)
Columbia rode to orbit on External Tank 93, a lightweight tank built by Lockheed Martin at the Michoud Assembly Facility in New Orleans. It was the structural backbone of the whole shuttle stack, 153.8 feet long and 27.6 feet in diameter, holding 143,351 gallons of liquid oxygen at minus 297 degrees Fahrenheit in its forward tank and 385,265 gallons of liquid hydrogen at minus 423 degrees in its aft tank, joined by a stiffened aluminum intertank. CAIB Report Vol. 1: 3.2 The External Tank and Foam (2003-08-26)
Three fittings held the orbiter to that tank: two umbilical fittings low down that carried fuel and electrical connections, and a bipod up top, two struts bolted to titanium forgings on the tank's nose. Because the tank held cryogenics, its aluminum skin wore foam insulation to keep the propellants cold and to keep ice from building on the surface, and the foam over the bipod fittings was shaped by hand into smooth ramps that let the supersonic airflow slide over the hardware. Hand sculpted foam, the accident board would note, is a variable material, and the bipod ramp was its most troublesome shape: foam had come off the bipod area on flights going back to 1983. CAIB Report Vol. 1: 3.2 The External Tank and Foam (2003-08-26) CAIB Report Vol. 1: 6.1 A History of Foam Anomalies (2003-08-26)
On that tank the foam was two materials: automated sprays of a lightweight formulation covered the tank's acreage, while fittings, closeouts and the bipod ramps were built up by hand with a second foam, BX 250. Nor had the ramp shape been still. The first thirteen tanks carried bipod ramps angled at 45 degrees; after foam tore from a ramp on STS 7, wind tunnel testing showed that shallower angles were aerodynamically preferable, so from External Tank 14 onward the angle dropped to between 22 and 30 degrees, and a slight modification to the ramp's impingement profile on External Tank 76 was the last change to the shape. The same hand built technique shaped the tank's other foam furniture, including the protuberance air load ramps that shielded its cable trays from the slipstream. What never changed was the fact of shedding itself. CAIB Report Vol. 1: 3.2 The External Tank and Foam (2003-08-26)
Against the heat of reentry, Columbia's wings wore the toughest material in the inventory: twenty two panels of reinforced carbon carbon on each leading edge, each panel unique, separated by RCC gap seals called T seals, coated in silicon carbide and rated for 3,000 degrees Fahrenheit. But the material had an Achilles heel written into its requirements. The shuttle was specified to withstand a debris impact of 0.006 foot pounds of kinetic energy, essentially nothing, because its designers had assumed that falling debris would not pose a threat during launch. The wing's armor was built for fire, not for being struck. CAIB Report Vol. 1: 3.3 Wing Leading Edge Structural Subsystem (2003-08-26)
That was the machine and the mission that stood on Launch Complex 39 A in the second week of January 2003: the science ship, thirteen delays behind its first schedule, carrying eighty experiments, seven astronauts, and, sprayed by hand over the left bipod fitting of its tank, the piece of foam that would bring the whole thing down. CAIB Report Vol. 1: 2.1 Mission Objectives and Their Rationales (2003-08-26) CAIB Report Vol. 1: 3.2 The External Tank and Foam (2003-08-26)