On 13 August 2013 a bench of Justices K S Radhakrishnan and Dipak Misra of the Supreme Court disposed of a bunch of petitions about the 330 MW Srinagar hydropower project on the Alaknanda, the case titled Alaknanda Hydro Power Company Ltd versus Anuj Joshi. SANDRP, the South Asia Network on Dams, Rivers and People, wrote that the decision was disappointing on the Srinagar project itself, because the court directed that it be completed and disposed of the objections, while asking for the environment management plan and conditions to be implemented. The part SANDRP called most pertinent began at page 62 of the order under the heading "Court's concerns." Uttarakhand Flood disaster: Supreme Court's directions on Uttarakhand Hydropower Projects, SANDRP Alaknanda Hydro Power Co.Ltd vs Anuj Joshi & Ors on 13 August, 2013 ndtv.com, Supreme Court says no to new hydro-electric projects in Uttarakhand, 2013-08-13 timesofindia.indiatimes.com, Uttarakhand tragedy fallout: SC orders review of 24 hydel projects, 2013-08-13
How the Srinagar project reached that bench is recorded in the judgment. The Duncans group had given it up after starting work, and the Alaknanda Hydro Power Company asked the environment ministry to transfer the original environmental clearance to it, which the ministry did on 27 March 2006 with the approval of the competent authority. The Uttarakhand High Court at Nainital, disposing of a public interest petition in April 2011, noticed that a clearance from 1985 covered a 200 MW project with a 63 metre dam and directed that construction beyond that limit could proceed only after a fresh decision from the ministry; a second High Court order directed the company to place the documents before the ministry for a public hearing, with the notice specifying the Dhari Devi temple premises as the venue. The Supreme Court set the public hearing direction aside: about 95 per cent of the work was already done, nearly Rs 4,000 crore had been spent, and neither the state nor the temple authorities had asked for a hearing. Alaknanda Hydro Power Co.Ltd vs Anuj Joshi & Ors on 13 August, 2013
In those pages the court noted that the Alternate Hydro Energy Centre at IIT Roorkee had not done the cumulative impact assessment it was asked to do. Paragraph 46 said that, prima facie, "the AHEC Report has not made any in depth study on the cumulative impact of all project components like construction of dam, tunnels, blasting, power house, Muck disposal, mining, deforestation etc." on the Alaknanda and Bhagirathi basins and on the Ganga. The order also referred to the B K Chaturvedi committee, appointed by the National Ganga River Basin Authority in June 2012, whose report was submitted in April 2013 and which said that the Ganga had suffered environmental degradation over the years. Uttarakhand Flood disaster: Supreme Court's directions on Uttarakhand Hydropower Projects, SANDRP Alaknanda Hydro Power Co.Ltd vs Anuj Joshi & Ors on 13 August, 2013 ndtv.com, Supreme Court says no to new hydro-electric projects in Uttarakhand, 2013-08-13 timesofindia.indiatimes.com, Uttarakhand tragedy fallout: SC orders review of 24 hydel projects, 2013-08-13
Two directions followed. The first told the Ministry of Environment and Forests and the state of Uttarakhand "not to grant any further environmental clearance or forest clearance for any hydroelectric power project in the State of Uttarakhand, until further orders." SANDRP read that as meaning no clearance for a hydropower project of any size by either the Ministry or the state. The second told the Ministry to constitute an expert body with representatives of the state government, the Wildlife Institute of India, the Central Electricity Authority, the Central Water Commission and other expert bodies to make a detailed study of whether existing and under construction hydroelectric projects had contributed to environmental degradation and if so to what extent. NDTV's report that day summarised the first of these as the court saying no to new hydroelectric projects in the state. Supreme Court judgment, Char Dham highway project (14 December 2021) Uttarakhand Flood disaster: Supreme Court's directions on Uttarakhand Hydropower Projects, SANDRP Alaknanda Hydro Power Co.Ltd vs Anuj Joshi & Ors on 13 August, 2013 ndtv.com, Supreme Court says no to new hydro-electric projects in Uttarakhand, 2013-08-13 timesofindia.indiatimes.com, Uttarakhand tragedy fallout: SC orders review of 24 hydel projects, 2013-08-13
A letter had gone to the Ministry earlier. SANDRP says that in July 2013 more than twenty groups and individuals, from Uttarakhand, Himachal Pradesh and other states, wrote to the Ministry asking for the suspension of the hydropower projects that had prima facie played a role in the June flood and for an independent enquiry, that the Ministry had not responded to the letter, and that it was the Supreme Court order the next month that pushed the Ministry to act. That is SANDRP's account. It is an advocacy group that had opposed several of the projects. The Ministry formed the expert body by an order of 15 October 2013, which the group called more than two months late. Uttarakhand Flood disaster: Supreme Court's directions on Uttarakhand Hydropower Projects, SANDRP Report of Expert Committee on Uttarakhand Flood Disaster & Role of HEPs: Welcome recommendations:, SANDRP
On 24 October 2013, The Hindu described the body. It would be headed by Ravi Chopra, director of the People's Science Institute in Dehradun and a member of the National Ganga River Basin Authority, and would include representatives from the Wildlife Institute of India, the Ministry, the state government, the Central Water Commission, the Central Electricity Authority, the Central Public Works Department and experts from leading environmental research institutes. It would examine whether the 24 proposed projects observed in a Wildlife Institute of India report were causing significant impact on the biodiversity of the Alaknanda and Bhagirathi basins. The Hindu noted the bench's concern at the "mushrooming" of hydro projects, small and big. The paper said the body would also examine the progress made by ongoing and under construction projects, as on the date of the tragedy, in complying with environmental conditions and safeguarding measures. Among the Ministry's further terms of reference were a study of the current state of the Himalayan glaciers and the projects' impact on them, safeguard measures for ongoing projects including tourism, and the drafting of a Himalayan Policy for Uttarakhand, which the report framed as an opportunity to identify possibilities for the state in harmony with its fragile ecology. Under expert scrutiny, The Hindu, 2013-10-24 gyanganga.ai, Assessment of Environmental Degradation and Impact of Hydroelectric projects during the June 2013 Disaster in Uttarakhand, Part I Main Report, Expert Body (chair Ravi Chopra), MoEF, April 2014 (mirror), 2014-04
Dated April 2014, the Chopra committee's report was submitted to the Ministry on 16 April 2014. It became public after a Supreme Court hearing on 28 April 2014, and its title was "Assessment of Environmental Degradation and Impact of Hydroelectric Projects During The June 2013 Disaster in Uttarakhand." It recommended that at least 23 projects be dropped, that hydropower projects played a significant role in the disaster, and that environment governance of the projects needed to improve. The Press Trust of India reported on 30 April 2014, in a despatch carried by The Indian Express, that the panel had concluded 23 of the 24 projects the Wildlife Institute of India recommended for review would have significant irreversible impacts on biodiversity in the Alaknanda and Bhagirathi basins. indianexpress.com, High-level panel suggests scrapping of 23 power projects in Uttarakhand, 2014-04-29 Uttarakhand Flood disaster: Supreme Court's directions on Uttarakhand Hydropower Projects, SANDRP Report of Expert Committee on Uttarakhand Flood Disaster & Role of HEPs: Welcome recommendations:, SANDRP
What happened at the dams is described in the report itself. It says floods are "not just about water but water and sediments," and that the major damage came from sediments and water together. The barrage of the under construction 76 MW Phata Byung project received a flood of 2,000 cumecs against a design capacity of 1,106, it says, and the Vishnuprayag barrage was obstructed by a high intensity debris flow brought down by the Khiron Ganga from glacial moraines. The report records doubt about whether Vishnuprayag's authorities managed the gates properly, and says boulders and debris blocked the passage through them, the river outflanked the barrage on the left bank, and it swept away the company's offices, helipad and the national highway. Lateral migration downstream then damaged the Lambagar market and Pandukeshwar up to Govind Ghat. The Singoli Bhatwari barrage under construction was outflanked on its right bank by about 30 metres, and a 10 metre flood wave silted adits under construction. The report's annexures record how the body worked. Its members divided the terms of reference among lead authors, invited experts to present on environmental flows and on impacts on wildlife, and made field visits on which they heard project officials at their sites about the flood event, disaster preparedness and the impacts and damages near the projects. They heard representations from project affected local communities during those visits, received and reviewed written representations from communities, developers and their spokespersons, and invited the state's Chief Secretary and other senior officials to present the state's perspective on hydropower development in Uttarakhand. On the contested science the body did not take the Wildlife Institute of India's report at face value: it sent the report for peer review to Dr Brij Gopal, an eminent scientist, heard project developers on the question, and commissioned laboratory analysis of sediment samples. gyanganga.ai, Assessment of Environmental Degradation and Impact of Hydroelectric projects during the June 2013 Disaster in Uttarakhand, Part I Main Report, Expert Body (chair Ravi Chopra), MoEF, April 2014 (mirror), 2014-04
On Srinagar, the body split, and the report says so. The project authorities said the dam held back about 26 million cubic metres of sediment, yet large parts of lower Srinagar town were swamped with sediments, and affected residents believed improper disposal of muck from the project was largely responsible for raising the river bed and flooding Shakti Vihar and the SSB campus. Dam officials accepted a rise in bed level at a few places below the site, but ascribed it to sediment from the catchment above. The report records that the body used strong recorded dissents to present an overall unanimous report, and says the role of the projects "led to sharp divisions in the EB." gyanganga.ai, Assessment of Environmental Degradation and Impact of Hydroelectric projects during the June 2013 Disaster in Uttarakhand, Part I Main Report, Expert Body (chair Ravi Chopra), MoEF, April 2014 (mirror), 2014-04
The majority view did not go unchallenged inside the body. A B Pandya, chairman of the Central Water Commission, told The Hindu that the members had submitted their report and that it was part of the Supreme Court proceedings; in his view, work on all 24 projects should go on. The committee's report records that after finalisation the representative of the state irrigation department, under pressure from senior officials, expressed a strong dissent that is recorded in its appendix, and the report's member list notes member Ajay Verma's dissent note of 13 April 2014. Two members of the body, Shekhar Pathak and Hemant Dhyani, wrote to the Home Ministry alleging that Central Water Commission and Central Electricity Authority officials were putting natural resources at stake to serve vested interests, The Hindu reported. SANDRP's objections ran the other way, alleging a conflict of interest for a member who had served on the Ministry's Expert Appraisal Committee for river valley projects, and complaining that the Central Water Commission and Central Electricity Authority "act like lobbies for hydropower projects.” The report's own account of its working records a body under strain: A N Purohit and Chandiprasad Bhatt withdrew for personal reasons after its constitution, the Central Public Works Department formally told the Ministry it had no significant role in the terms of reference, and the National Disaster Management Authority's representative wrote that it would submit its own report to the Supreme Court and would not participate. The Ministry later nominated three new members and named B P Das as cochairman, while the members nominated from the Central Water Commission and the Central Electricity Authority took part irregularly and finally withdrew at the fifth meeting, citing differences over the terms of reference. The committee held seven formal meetings and made two field visits, and it noted that members' alternate views had been placed on record in the relevant sections, leaving it able to present what it called an overall unanimous report. gyanganga.ai, Assessment of Environmental Degradation and Impact of Hydroelectric projects during the June 2013 Disaster in Uttarakhand, Part I Main Report, Expert Body (chair Ravi Chopra), MoEF, April 2014 (mirror), 2014-04 Uttarakhand Flood disaster: Supreme Court's directions on Uttarakhand Hydropower Projects, SANDRP CEA and CWC are serving vested interests, says expert panel, The Hindu Report of Expert Committee on Uttarakhand Flood Disaster & Role of HEPs: Welcome recommendations:, SANDRP
As a claim for money, the argument about the dams' role reached the National Green Tribunal, and it ended without one. In February 2023, disposing of an application by the Mandakini Badh Prabhavit Samiti, a bench headed by Chairperson Adarsh Kumar Goel recorded the claim: Rs 8.94 crore from L&T Uttaranchal Hydropower for houses damaged when the Singoli Bhatwari hydroelectric project on the Mandakini was, in the applicants' account, blocked and broken in the June 2013 flood, plus Rs 4.14 crore for mental agony. The tribunal's order shows the state of the evidence: the state said compensation of Rs 7 lakh each had already been paid for property loss; the company called the flood an act of God and said the committee findings the applicants relied on were individual members' views, pointing to the separate report by the Central Water Commission's chairman and the Central Electricity Authority's chief engineer; and the Supreme Court had yet to decide on the expert reports in the appeal before it. Finding no material to substantiate a claim beyond the compensation already granted, the tribunal rejected the application, without prejudice to any remedy that might follow the Supreme Court's pending decision. Mandakini Badh Prabhavit Samiti vs L&T Uttaranchal Hydropower Ltd on 10 February, 2023
Summarising the report in July 2014, The Hindu wrote that the panel recommended no hydroelectric projects in the paraglacial region, which it located at about 2,200 to 2,500 metres, and that the region contained 76 projects with a combined capacity of more than 3,100 megawatts. The same report made the exposure concrete: loose glacial debris carried downstream from such ground could be disastrous, and the June 2013 damage at the Vishnuprayag barrage site and below, at Lambagar, Pandukeshwar and Govindghat, was the committee's case in point. The terms of reference had been narrowed, SANDRP complained, because the Supreme Court order covered the whole state but the Ministry's order and the Central Water Commission tried to restrict the committee's work to the Alaknanda and Bhagirathi sub basins. A National Green Tribunal order on a claim by Mandakini valley flood victims against the developer of the Singoli Bhatwari project, which sought Rs 8,94,10,000 for damaged houses, noted that compensation of Rs 7 lakh had already been granted to each of the victims. thehindu.com, Chopra panel report recommends 'no dams in paraglacial regions', The Hindu, 2014-07-22 Mandakini Badh Prabhavit Samiti vs L&T Uttaranchal Hydropower Ltd on 10 February, 2023 Uttarakhand Flood disaster: Supreme Court's directions on Uttarakhand Hydropower Projects, SANDRP Report of Expert Committee on Uttarakhand Flood Disaster & Role of HEPs: Welcome recommendations:, SANDRP