A safety survey in May 1982

Published 15 October 2026

Two and a half years before the leak, Carbide's own engineers inspected the Bhopal plant and wrote it down. The Sambhavna Trust's digital archive holds the report, which it says was obtained through discovery in a United States court. It is an Operational Safety Survey of the carbon monoxide, MIC and Sevin units, begun on 3 May 1982 by L.A. Kail, J.M. Poulson as team chairman, and C.S. Tyson, and the final report is dated 27 September 1982. The covering letter from J.M. Fallon of Union Carbide's chemicals and plastics division in South Charleston, West Virginia, went to J. Mukund at UCIL in Bhopal, who was the works manager at the time of the leak and was convicted in 2010. The archive's scanned copy is rendered through text recognition, which is noisy, so quotation is limited to passages where the wording is clear. [9]

The letter and the summary are not hostile. The team said it was very favourably impressed by the number and quality of operating and maintenance procedures developed over the previous one to two years, and by the job safety analyses that went with them, and it reported that no situation involving imminent danger or requiring immediate correction was found. The letter said that continued work on procedures, training and enforcement, together with attention to the equipment and mechanical deficiencies described in the report, should contribute to the plant's safety effort. It added that it is customary for a surveyed unit to prepare an action plan within about 60 days. [9]

The body of the report lists nine concerns the team classed as major, and the list reads like a preview. They include lack of reliable automatic backup for cooling water on the carbon monoxide converter shells, possible air entry into the flare header, potentials for release of toxic materials in the phosgene and MIC unit and storage areas, lack of fixed water spray protection in several areas, possible dust explosions in the Sevin area, potential for contamination, overpressure or overfilling of the Sevin MIC feed tank, deficiencies in safety valve and instrument maintenance, deficiencies in lockout procedures, and possible contamination of the nitrogen header. A tenth item, high personnel turnover, was listed after the nine. [9]

Some of the details matter to what happened in 1984. The team found no fixed water spray system for fire protection or vapour cloud dispersal in the MIC operating area, and none for the MIC and related storage areas, and it warned that existing fire water monitors could be ineffective under adverse wind or hazardous to reach after a wind shift. It observed an MIC shutoff valve leaking so severely that even evacuating the line above it did not prevent a release when a blind flange was removed. It said it was possible to contaminate the Sevin MIC feed tank with material from the vent gas scrubber, because gases could back up from the scrubber to the tank when the tank was depressurised, and it questioned the adequacy of the tank's relief valve, particularly since the tank had been enlarged. It noted that the tank was filled by manual control with no instrumentation backup, and recommended an automatic high level shutoff. [9]

On the nitrogen the plant would later need, the report said nitrogen header pressure in parts of the plant had sometimes dropped below process pressures, allowing contamination of the header, and that this had reportedly happened several times in the chlorine unloading area. On staffing, it said operator and technical turnover appeared to pose a serious problem, that the team was concerned that personnel were being released for independent operation without enough understanding of safe operating procedures, and it cited an operator working alone in the storage and unloading area after only a short time on the job. [9]

This document has limits. It surveyed the Sevin unit's MIC feed tank and the MIC handling areas, not the underground storage tanks, and it did not predict the water contamination of 3 December 1984. The covering letter says only that an action plan was customary, and the document does not record whether one was prepared or carried out. What it shows is narrower and still firm: in 1982 Carbide's own team, writing to the plant's works manager, had put in writing that the plant had toxic release potentials, leaking valves, missing water spray protection, a scrubber that could back up into an MIC tank, and an operating staff with high turnover. [9]