Midnight, and the gauge ran off the scale
Published 15 October 2026
Begin with the tank, because two sets of experts spent a decade arguing over what was in it. According to the CSIR team, tank 610 held 6.4 tonnes of MIC at the start of a production run on 7 October 1984, and another 36 tonnes went in over the following days. On 18 October, 23 tonnes were moved across to tank 611. From 19 to 22 October every extra tonne of MIC the plant made went into 610, and when production stopped on 22 October the tank held about 42 tonnes. Tank 611 held a comparable quantity. [8]
MIC in these tanks was supposed to sit under nitrogen at around 1 kg per square centimetre, and that nitrogen pressure was also what pushed liquid MIC out to the Sevin unit. Until 21 October the pressure in 610 was reported at 1.25. During the night shift of 21 and 22 October it fell to 0.25 and then stayed between 0.1 and 0.25 from 22 October on. The CSIR report's reading of those numbers is blunt: such values are not an indication of any positive nitrogen pressure, and the contents were nearly at atmospheric pressure. For the next five weeks no MIC was drawn from 610. The plant fed Sevin from 611 instead. [8]
On 30 November the pressurising system on tank 611 gave trouble, and operators tried to pressurise 610 to draw from it instead. They could not. They found another way to pressurise 611 and carried on. On the second shift of 1 December they tried 610 again, with no significant success, and made no further effort. So for 41 days a tank holding about 42 tonnes of one of the most reactive industrial chemicals in use was effectively open to atmospheric pressure, with its refrigeration off and its temperature alarm disconnected. [8] [33]
The IChemE article records the tank's pressure history. The IChemE article says tank 610 failed to pressurise on 30 November and 1 December, and that on 2 December at 10.20 pm it was pressurised to 1.1 bar with a content of 41 tonnes, which it puts at 70 percent of capacity. [33] [8]
Then the evening of 2 December. By the IChemE account based on Carbide's report, shortly after the shift change at around 10.45 to 11 pm, the pressure in tank 610 read 1.7 bar, which sat within the permitted band of 1.1 to 2.7 bar, and the operator assumed it was normal. The IChemE article notes that it is not known whether the incoming operator knew the earlier reading of 1.1, that nobody seems to have considered sudden rises as opposed to static readings, and that the temperature of the contents was not recorded. The article's UCC derived timetable has an MIC leak reported in the process area at the same time, source not identified. [33]
The CSIR report gives the ground level view. The first leak was noticed at 11.30 pm in the MIC structure near the vent gas scrubber. Operators on the ground saw dirty water spilling from a higher level and felt their eyes sting. They climbed the stairs and found MIC and dirty water coming out of a branch of the relief valve vent header, downstream of a pressure safety valve. That valve had been removed, and the open end of the branch line had not been blinded. Around midnight the operators went to the control room and told the plant superintendent and the supervisor, who advised them to spray water around the leak. [8]
About 15 minutes later the control room operator was told of the leak. He looked at the pressure indicator for tank 610 and saw it shooting up, in the range of 25 to 30 psig. Between 12.15 and 12.30 am the indicator went beyond the maximum of its scale, higher than 55 psig. He walked to the storage area and heard a hissing sound from the downstream line of the relief valve, which meant the valve had popped. The local temperature and pressure transmitters on the tank werereading beyond their ranges, +25 degrees Celsius and 55 psig. He ran back to the control room and started the scrubber circulation pump, and the flow indicator showed no circulation of caustic soda. By then a gas cloud was visible coming out of the stack. [8]
The article's UCC derived timetable puts the same minutes in its own words: at 12.15 am an MIC release near the scrubber and the process filters, tank pressure 3.1 bar and then a rapid increase to 4.8 bar, the top of the scale. The supervisor ran to tank 610 and felt heat radiating from it, heard rumbling, and heard a screech from the safety valve. He started the scrubber circulation pumps. The article notes that the flow indicator did not show flow, although later examination suggested flow did occur. [33]
The article's event table puts the plant superintendent's notification at 12.20, his arrival at 12.25, high MIC levels in the air and suspension of derivatives unit operations at 12.45, and the toxic gas alarm, sounded by an operator, at 1.00 am. Fire water monitors were turned on the scrubber, water was directed at the mound over tank 610, steam was seen rising, and the safety valve reseated, which indicated the pressure had fallen below 3.8 bar. [8] [33]
CSIR records a further detail. Water sprayed from about 1.00 am on the MIC structure reportedly did not reach the top of it. A water curtain that cannot reach the point of release is a decoration. [8]
The IChemE article says it was calculated that to empty the tank in the roughly two hours the safety valve was thought to be open, the pressure must have averaged 13.4 bar, above the 3.8 bar design pressure, and that the temperature in the tank must have passed 200 degrees Celsius. The CSIR team, from the exhumed tank's bulging and the residue's chemistry, put it above 250 degrees. [33] [8]